Scottish Rite Park Inc
Des Moines, IA · 51 certified beds · Last Life Safety survey August 13, 2026
CMS Certification Number 165593 · first certified May 2009
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within IA
6 citations — more than 16% of the 387 certified nursing homes in IA. Compared within IA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys on file averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens July 2027 — about 8 months from now. This facility’s last Life Safety survey was August 2026. Facilities in IA are typically surveyed 11–13 months after the last one (median 12), measured over 692 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about Scottish Rite Park Inc
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 6 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
How that compares
Compared with the median facility in IA, and nationally. Surveyors differ markedly between states, so the IA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 6 |
| Median facility in IA | 12 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 18, 2024 | 2 |
| June 26, 2025 | 2 |
| August 13, 2026 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2025-06-26 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2026-08-13 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2026-08-13 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2025-06-26 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-07-18 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2024-07-18 |
What the citations cover
- Smoke Deficiencies 4
- Gas, Vacuum, and Electrical Systems Deficiencies 1
- Miscellaneous Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 13, 2026 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 15, 2026) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (August 15, 2026) |
June 26, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (June 25, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 25, 2025) |
July 18, 2024 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (July 25, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (July 25, 2024) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.