Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Osage Rehab and Health Care Center
Osage, IA · 46 certified beds · Last Life Safety survey December 22, 2025
CMS Certification Number 165173 · first certified April 1992
Ownership
Operated by CAMPBELL STREET SERVICES · For profit - Limited Liability company
- New ownershipOwnership changed February 1, 2025 (change of ownership)to OSAGE REHAB & HEALTH CARE CENTER from PREMIER ESTATES 508 LLC
Position within IA
44 citations — more than 100% of the 387 certified nursing homes in IA. Compared within IA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 17 citations; the earlier surveys in the window averaged 9. With 4 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens November 2026 — about 1 month from now. This facility’s last Life Safety survey was December 2025. Facilities in IA are typically surveyed 11–13 months after the last one (median 12), measured over 700 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Osage Rehab and Health Care Center
One email when it happens. No account; stop it any time with one click.
6 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
10 of the 44 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 44 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
How that compares
Compared with the median facility in IA, and nationally. Surveyors differ markedly between states, so the IA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 44 |
| Median facility in IA | 12 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 30, 2023 | 15 |
| November 14, 2024 | 10 |
| April 4, 2025 | 2 |
| December 22, 2025 | 17 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| E-0039 | Conduct testing and exercise requirements. | 3 | 2025-12-22 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 3 | 2025-12-22 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2025-12-22 |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | 2 | 2025-12-22 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 2 | 2025-12-22 |
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2025-12-22 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 2 | 2025-12-22 |
| K-0324 | Provide properly protected cooking facilities. | 2 | 2025-12-22 |
What the citations cover
- Smoke Deficiencies 12
- Emergency Preparedness Deficiencies 10
- Gas, Vacuum, and Electrical Systems Deficiencies 9
- Egress Deficiencies 7
- Other 6
| Category | Citations |
|---|---|
| Smoke Deficiencies | 12 |
| Emergency Preparedness Deficiencies | 10 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 9 |
| Egress Deficiencies | 7 |
| Miscellaneous Deficiencies | 4 |
| Services Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
December 22, 2025 — 17 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0030 | List the names and contact information of those in the facility. | Deficient, Provider has date of correction (March 6, 2026) |
| E-0036 | Establish emergency prep training and testing. | Deficient, Provider has date of correction (March 6, 2026) |
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (March 6, 2026) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (March 27, 2026) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (March 6, 2026) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (March 6, 2026) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (March 6, 2026) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (March 6, 2026) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (March 31, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (March 6, 2026) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (March 6, 2026) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (March 6, 2026) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (March 6, 2026) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (March 6, 2026) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (March 6, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (March 6, 2026) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (March 11, 2026) |
April 4, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (July 21, 2025) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (July 21, 2025) |
November 14, 2024 — 10 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (November 27, 2024) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (December 21, 2024) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (December 13, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (November 21, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (November 26, 2024) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (December 6, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (December 6, 2024) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (December 6, 2024) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (December 21, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (December 20, 2024) |
August 30, 2023 — 15 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (September 30, 2023) |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (September 11, 2023) |
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (September 30, 2023) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (September 30, 2023) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (September 5, 2023) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (September 7, 2023) |
| K-0227 | Have ramps, exits, fire escape ladders, steps, and areas of refuge that meet safety requirements. | Deficient, Provider has date of correction (September 30, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (September 7, 2023) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (September 30, 2023) |
| K-0343 | Have a fire alarm with audible and visual signals that transmits the alarm automatically to notify emergency forces in event of fire. | Deficient, Provider has date of correction (August 30, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (September 5, 2023) |
| K-0541 | Install properly constructed and protected linen or trash chutes. | Deficient, Provider has date of correction (September 30, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 5, 2023) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (September 7, 2023) |
| K-0926 | Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk. | Deficient, Provider has date of correction (September 30, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.