Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Sanford Senior Care Sheldon
Sheldon, IA · 70 certified beds · Last Life Safety survey November 6, 2025
CMS Certification Number 16E263 · first certified May 1978
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within IA
8 citations — more than 26% of the 387 certified nursing homes in IA. Compared within IA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys on file averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: October 2026 to December 2026. This facility’s last Life Safety survey was November 2025. Facilities in IA are typically surveyed 11–13 months after the last one (median 12), measured over 692 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about Sanford Senior Care Sheldon
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 8 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in IA, and nationally. Surveyors differ markedly between states, so the IA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 8 |
| Median facility in IA | 12 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| June 29, 2023 | 4 |
| October 3, 2024 | 3 |
| November 6, 2025 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0711 | Provide a written emergency evacuation plan. | 1 | 2025-11-06 |
| K-0161 | Use approved construction type or materials. | 1 | 2024-10-03 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-10-03 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2023-06-29 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2023-06-29 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2023-06-29 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2024-10-03 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2023-06-29 |
What the citations cover
- Miscellaneous Deficiencies 3
- Smoke Deficiencies 2
- Egress Deficiencies 1
- Construction Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Miscellaneous Deficiencies | 3 |
| Smoke Deficiencies | 2 |
| Egress Deficiencies | 1 |
| Construction Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
November 6, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (November 17, 2025) |
October 3, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (October 16, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (October 18, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (October 18, 2024) |
June 29, 2023 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (July 5, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (July 31, 2023) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (July 14, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (July 6, 2023) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.