Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Meadow View Nursing and Rehabilitation
Nampa, ID · 122 certified beds · Last Life Safety survey November 19, 2025
CMS Certification Number 135076 · first certified January 1979
Ownership
Operated by THE ENSIGN GROUP · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within ID
7 citations — more than 33% of the 80 certified nursing homes in ID. Compared within ID rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens November 2026 — about 2 months from now. This facility’s last Life Safety survey was November 2025. Facilities in ID are typically surveyed 12–36 months after the last one (median 14), measured over 112 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Meadow View Nursing and Rehabilitation
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
2 of the 7 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 7 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in ID, and nationally. Surveyors differ markedly between states, so the ID figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 7 |
| Median facility in ID | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 11, 2019 | 3 |
| August 9, 2024 | 3 |
| November 19, 2025 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 2 | 2025-11-19 |
| E-0009 | Include a process for Emergency Preparedness collaboration. | 1 | 2019-07-11 |
| E-0015 | Address subsistence needs for staff and patients. | 1 | 2019-07-11 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2024-08-09 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2024-08-09 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2024-08-09 |
What the citations cover
- Egress Deficiencies 3
- Emergency Preparedness Deficiencies 2
- Miscellaneous Deficiencies 1
- Smoke Deficiencies 1
| Category | Citations |
|---|---|
| Egress Deficiencies | 3 |
| Emergency Preparedness Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
| Smoke Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
November 19, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (May 19, 2026) |
August 9, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (June 25, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (June 25, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (June 25, 2024) |
July 11, 2019 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0009 | Include a process for Emergency Preparedness collaboration. | Deficient, Provider has date of correction (April 5, 2019) |
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (April 5, 2019) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (April 5, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.