Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
LOFT REHAB & NURSING OF CANTON
CANTON, IL · 90 certified beds · Last Life Safety survey August 22, 2024
CMS Certification Number 145600 · first certified November 1988
Ownership
Operated by THE LOFT REHABILITATION AND NURSING · For profit - Corporation
- Ownership changed December 1, 2018 (change of ownership)to LOFT REHABILITATION AND NURSING OF CANTON from HEARTLAND OF CANTON IL LLC
Position within IL
15 citations — more than 50% of the 666 certified nursing homes in IL. Compared within IL rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 6. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (July 2025 to October 2025), and past the point by which nine in ten IL facilities have been surveyed. This facility’s last Life Safety survey was August 2024. Facilities in IL are typically surveyed 11–13 months after the last one (median 12), measured over 759 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about LOFT REHAB & NURSING OF CANTON
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 15 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 15 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in IL, and nationally. Surveyors differ markedly between states, so the IL figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 15 |
| Median facility in IL | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 19, 2022 | 6 |
| May 25, 2023 | 6 |
| August 22, 2024 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2024-08-22 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2024-08-22 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2023-05-25 |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | 2 | 2023-05-25 |
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2024-08-22 |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | 1 | 2022-08-19 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2022-08-19 |
| E-0039 | Conduct testing and exercise requirements. | 1 | 2023-05-25 |
What the citations cover
- Smoke Deficiencies 7
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Miscellaneous Deficiencies 3
- Emergency Preparedness Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 7 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Miscellaneous Deficiencies | 3 |
| Emergency Preparedness Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 22, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (September 30, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 30, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (September 30, 2024) |
May 25, 2023 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (June 13, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (June 13, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (July 6, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 13, 2023) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (June 13, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 3, 2023) |
August 19, 2022 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (September 1, 2022) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 1, 2022) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (September 1, 2022) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (September 1, 2022) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (September 1, 2022) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 1, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.