Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Landmark of Cicero Rehabilitation and Nursing Cent
CICERO, IL · 485 certified beds · Last Life Safety survey January 8, 2026
CMS Certification Number 145850 · first certified December 1995
Ownership
Operated by INFINITY HEALTHCARE CONSULTING · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within IL
20 citations — more than 64% of the 666 certified nursing homes in IL. Compared within IL rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys in the window averaged 7.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens December 2026 — about 2 months from now. This facility’s last Life Safety survey was January 2026. Facilities in IL are typically surveyed 11–13 months after the last one (median 12), measured over 759 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Landmark of Cicero Rehabilitation and Nursing Cent
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 20 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
13 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 20 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0880 Provide and implement an infection prevention and control program.
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
- F-0924 Put firmly secured handrails on each side of hallways.
- F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.
How that compares
Compared with the median facility in IL, and nationally. Surveyors differ markedly between states, so the IL figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 20 |
| Median facility in IL | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| January 23, 2025 | 7 |
| June 6, 2025 | 8 |
| January 8, 2026 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0363 | Install corridor and hallway doors that block smoke. | 3 | 2026-01-08 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2025-06-06 |
| K-0311 | Have an enclosure around a vertical opening shaft. | 2 | 2025-06-06 |
| K-0221 | Provide rooms that can be unlocked from inside without a key. | 1 | 2026-01-08 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2026-01-08 |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | 1 | 2025-06-06 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2025-06-06 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2025-06-06 |
What the citations cover
- Smoke Deficiencies 10
- Egress Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Emergency Preparedness Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 10 |
| Egress Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Emergency Preparedness Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 8, 2026 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0221 | Provide rooms that can be unlocked from inside without a key. | Deficient, Provider has date of correction (February 26, 2026) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (February 26, 2026) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (February 26, 2026) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (February 26, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (February 26, 2026) |
June 6, 2025 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (June 25, 2025) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (June 25, 2025) |
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (June 25, 2025) |
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (June 25, 2025) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (June 25, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 25, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (June 25, 2025) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (June 25, 2025) |
January 23, 2025 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (January 31, 2025) |
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (January 31, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (January 31, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (January 31, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (January 31, 2025) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (January 31, 2025) |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | Deficient, Provider has date of correction (January 31, 2025) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.