Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
FARMINGTON VILLAGE NRSG
FARMINGTON, IL · 92 certified beds · Last Life Safety survey May 29, 2025
CMS Certification Number 145404 · first certified August 1980
Ownership
Operated by ATIED ASSOCIATES · For profit - Limited Liability company
- Ownership changed May 1, 2022 (change of ownership)to FARMINGTON VILLAGE NURSING AND REHABILITATION CENTER from AMERICAN HEALTH CORPORATION AND SUBSIDIARIES
Position within IL
8 citations — more than 29% of the 666 certified nursing homes in IL. Compared within IL rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (April 2026 to July 2026), and past the point by which nine in ten IL facilities have been surveyed. This facility’s last Life Safety survey was May 2025. Facilities in IL are typically surveyed 11–13 months after the last one (median 12), measured over 759 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about FARMINGTON VILLAGE NRSG
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 8 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in IL, and nationally. Surveyors differ markedly between states, so the IL figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 8 |
| Median facility in IL | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 15, 2023 | 2 |
| April 5, 2024 | 4 |
| May 29, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2023-03-15 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2024-04-05 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2025-05-29 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2024-04-05 |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | 1 | 2023-03-15 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2025-05-29 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2024-04-05 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-04-05 |
What the citations cover
- Smoke Deficiencies 4
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Miscellaneous Deficiencies 1
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 29, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (June 3, 2025) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (June 3, 2025) |
April 5, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (April 19, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 19, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (April 19, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (April 19, 2024) |
March 15, 2023 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (March 29, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (March 29, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.