Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
APERION CARE FOREST PARK
FOREST PARK, IL · 232 certified beds · Last Life Safety survey February 26, 2026
CMS Certification Number 145969 · first certified June 1998
Ownership
Operated by APERION CARE · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within IL
49 citations — more than 97% of the 664 certified nursing homes in IL. Compared within IL rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 15 citations; the earlier surveys on file averaged 17. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens January 2027 — about 3 months from now. This facility’s last Life Safety survey was February 2026. Facilities in IL are typically surveyed 11–14 months after the last one (median 13), measured over 739 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about APERION CARE FOREST PARK
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
7 of the 49 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
23 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 49 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0880 Provide and implement an infection prevention and control program.
- F-0908 Keep all essential equipment working safely.
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
How that compares
Compared with the median facility in IL, and nationally. Surveyors differ markedly between states, so the IL figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 49 |
| Median facility in IL | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 17, 2023 | 23 |
| January 17, 2025 | 11 |
| February 26, 2026 | 15 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 3 | 2026-02-26 |
| K-0363 | Install corridor and hallway doors that block smoke. | 3 | 2026-02-26 |
| K-0351 | Install an approved automatic sprinkler system. | 3 | 2026-02-26 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 3 | 2026-02-26 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 2 | 2026-02-26 |
| K-0923 | Have proper medical gas storage and administration areas. | 2 | 2026-02-26 |
| E-0007 | Address patient/client population and determine types of services needed. | 2 | 2025-01-17 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 2 | 2026-02-26 |
What the citations cover
- Smoke Deficiencies 17
- Gas, Vacuum, and Electrical Systems Deficiencies 10
- Egress Deficiencies 7
- Emergency Preparedness Deficiencies 7
- Other 8
| Category | Citations |
|---|---|
| Smoke Deficiencies | 17 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 10 |
| Egress Deficiencies | 7 |
| Emergency Preparedness Deficiencies | 7 |
| Services Deficiencies | 4 |
| Miscellaneous Deficiencies | 2 |
| Construction Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
February 26, 2026 — 15 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (July 1, 2026) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (July 6, 2026) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (July 2, 2026) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (July 1, 2026) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (July 1, 2026) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 4, 2026) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (July 2, 2026) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (July 1, 2026) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (July 1, 2026) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (July 3, 2026) |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | Deficient, Provider has date of correction (July 1, 2026) |
| K-0541 | Install properly constructed and protected linen or trash chutes. | Deficient, Provider has date of correction (July 1, 2026) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (July 6, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (July 8, 2026) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (July 10, 2026) |
January 17, 2025 — 11 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0007 | Address patient/client population and determine types of services needed. | Deficient, Provider has date of correction (January 29, 2025) |
| E-0032 | Provide primary/alternate means for communication. | Deficient, Provider has date of correction (January 29, 2025) |
| K-0232 | Have corridors or aisles that are unobstructed and are at least 8 feet in width. | Deficient, Provider has date of correction (January 29, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (January 29, 2025) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (February 7, 2025) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (January 29, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (January 29, 2025) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (January 29, 2025) |
| K-0754 | Provide properly sized and located linen or trash receptacles. | Deficient, Provider has date of correction (January 29, 2025) |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | Deficient, Provider has date of correction (January 29, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (February 11, 2025) |
November 17, 2023 — 23 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0007 | Address patient/client population and determine types of services needed. | Deficient, Provider has date of correction (December 4, 2023) |
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (December 4, 2023) |
| E-0022 | Establish policies and procedures for sheltering. | Deficient, Provider has date of correction (December 4, 2023) |
| E-0024 | Establish policies and procedures for volunteers. | Deficient, Provider has date of correction (December 4, 2023) |
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (December 4, 2023) |
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (December 4, 2023) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (December 9, 2023) |
| K-0232 | Have corridors or aisles that are unobstructed and are at least 8 feet in width. | Deficient, Provider has date of correction (December 9, 2023) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (December 9, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (December 9, 2023) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (December 9, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Waiver has been granted (December 22, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (December 9, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (December 9, 2023) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (December 9, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (December 9, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (December 9, 2023) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (December 9, 2023) |
| K-0909 | Ensure gas and vacuum piping is labeled. | Deficient, Provider has date of correction (December 9, 2023) |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | Deficient, Provider has date of correction (December 9, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (December 9, 2023) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (December 9, 2023) |
| K-0929 | Ensure precautions for handling oxygen cylinders and equipment are correctly followed. | Deficient, Provider has date of correction (December 9, 2023) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.