Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

INVERNESS REHAB

INVERNESS, IL · 142 certified beds · Last Life Safety survey August 22, 2025

CMS Certification Number 145994 · first certified May 2000

Ownership

Independently operated (no chain recorded by CMS) · For profit - Limited Liability company

  • Ownership changed December 1, 2023 (change of ownership)to INVERNESS REHAB, LLC from INVERNESS NH LLC
37
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
10
Tags cited more than once
Across separate surveys
16
Inspection & testing records
Of the citations on file

Position within IL

37 citations — more than 90% of the 666 certified nursing homes in IL. Compared within IL rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 16 citations; the earlier surveys in the window averaged 10.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: July 2026 to October 2026. This facility’s last Life Safety survey was August 2025. Facilities in IL are typically surveyed 11–13 months after the last one (median 12), measured over 759 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about INVERNESS REHAB

One email when it happens. No account; stop it any time with one click.

Which alerts

6 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

10 of the 37 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 37 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in IL, and nationally. Surveyors differ markedly between states, so the IL figure is the meaningful one.

This facility37IL median15National median11
Citations on file over three years, compared
MeasureCitations
This facility37
Median facility in IL15
Median facility nationally11

Survey history

Citations at each Life Safety survey
92023-04122024-07162025-08
Citations at each Life Safety survey
Survey dateCitations
April 13, 20239
July 11, 202412
August 22, 202516

Most-cited tags

Most-cited tags at this facility
K-03533K-03453K-09182K-01612K-03212E-00392K-07122K-03242
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0353Inspect, test, and maintain automatic sprinkler systems.32025-08-22
K-0345Have approved installation, maintenance and testing program for fire alarm systems.32025-08-22
K-0918Have generator or other power source capable of supplying service within 10 seconds.22025-08-22
K-0161Use approved construction type or materials.22025-08-22
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.22025-08-22
E-0039Conduct testing and exercise requirements.22025-08-22
K-0712Have simulated fire drills held at unexpected times.22025-08-22
K-0324Provide properly protected cooking facilities.22025-08-22

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 16
  • Emergency Preparedness Deficiencies 10
  • Gas, Vacuum, and Electrical Systems Deficiencies 5
  • Miscellaneous Deficiencies 3
  • Other 3
Citations by CMS category
CategoryCitations
Smoke Deficiencies16
Emergency Preparedness Deficiencies10
Gas, Vacuum, and Electrical Systems Deficiencies5
Miscellaneous Deficiencies3
Construction Deficiencies2
Egress Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

August 22, 2025 — 16 citations

Citations issued on August 22, 2025
TagWhat the surveyor checksStatus
E-0015Address subsistence needs for staff and patients.Deficient, Provider has date of correction (September 30, 2025)
E-0023Establish policies and procedures for medical documentation.Deficient, Provider has date of correction (September 30, 2025)
E-0024Establish policies and procedures for volunteers.Deficient, Provider has date of correction (September 30, 2025)
E-0032Provide primary/alternate means for communication.Deficient, Provider has date of correction (September 30, 2025)
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (September 30, 2025)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (September 30, 2025)
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (September 30, 2025)
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (September 30, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (September 30, 2025)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (September 30, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (September 30, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (November 17, 2025)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (September 30, 2025)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (September 30, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (September 30, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (September 30, 2025)

July 11, 2024 — 12 citations

Citations issued on July 11, 2024
TagWhat the surveyor checksStatus
E-0007Address patient/client population and determine types of services needed.Deficient, Provider has date of correction (July 12, 2024)
E-0022Establish policies and procedures for sheltering.Deficient, Provider has date of correction (July 12, 2024)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (July 12, 2024)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (July 22, 2024)
K-0324Provide properly protected cooking facilities.Waiver has been granted (August 15, 2024)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Waiver has been granted (August 9, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Waiver has been granted (August 9, 2024)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (July 22, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (July 22, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Waiver has been granted (August 15, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (July 22, 2024)
K-0929Ensure precautions for handling oxygen cylinders and equipment are correctly followed.Deficient, Provider has date of correction (July 22, 2024)

April 13, 2023 — 9 citations

Citations issued on April 13, 2023
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (May 23, 2023)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (May 23, 2023)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (May 23, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (May 23, 2023)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (May 23, 2023)
K-0362Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.Deficient, Provider has date of correction (May 23, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (May 23, 2023)
K-0754Provide properly sized and located linen or trash receptacles.Deficient, Provider has date of correction (May 23, 2023)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (May 23, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.