Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

MCLEANSBORO REHAB & HLTH C CTR

MCLEANSBORO, IL · 43 certified beds · Last Life Safety survey June 7, 2024

CMS Certification Number 145964 · first certified June 1998

Ownership

Independently operated (no chain recorded by CMS) · For profit - Individual

No change of ownership on CMS record since January 1, 2016, when the records begin.

40
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
13
Tags cited more than once
Across separate surveys
18
Inspection & testing records
Of the citations on file

Position within IL

40 citations — more than 92% of the 666 certified nursing homes in IL. Compared within IL rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 24 citations; the earlier surveys in the window averaged 8. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Well past the typical window (May 2025 to July 2025), and past the point by which nine in ten IL facilities have been surveyed. This facility’s last Life Safety survey was June 2024. Facilities in IL are typically surveyed 11–13 months after the last one (median 12), measured over 759 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about MCLEANSBORO REHAB & HLTH C CTR

One email when it happens. No account; stop it any time with one click.

Which alerts

7 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

10 of the 40 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 40 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.

How that compares

Citations on file over three years

Compared with the median facility in IL, and nationally. Surveyors differ markedly between states, so the IL figure is the meaningful one.

This facility40IL median15National median11
Citations on file over three years, compared
MeasureCitations
This facility40
Median facility in IL15
Median facility nationally11

Survey history

Citations at each Life Safety survey
62022-04102023-05242024-06
Citations at each Life Safety survey
Survey dateCitations
April 7, 20226
May 4, 202310
June 7, 202424

Most-cited tags

Most-cited tags at this facility
K-07123K-03553K-05112K-02932K-03462K-03532K-02812K-02912
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0712Have simulated fire drills held at unexpected times.32024-06-07
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.32024-06-07
K-0511Have properly installed electrical wiring and gas equipment.22024-06-07
K-0293Have properly located and lighted "Exit" signs.22024-06-07
K-0346Follow proper procedures when the fire alarm was out of service for more than 4 hours.22024-06-07
K-0353Inspect, test, and maintain automatic sprinkler systems.22024-06-07
K-0281Install proper backup exit lighting.22024-06-07
K-0291Install emergency lighting that can last at least 1 1/2 hours.22024-06-07

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 16
  • Emergency Preparedness Deficiencies 10
  • Egress Deficiencies 7
  • Miscellaneous Deficiencies 3
  • Other 4
Citations by CMS category
CategoryCitations
Smoke Deficiencies16
Emergency Preparedness Deficiencies10
Egress Deficiencies7
Miscellaneous Deficiencies3
Services Deficiencies2
Gas, Vacuum, and Electrical Systems Deficiencies2

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

June 7, 2024 — 24 citations

Citations issued on June 7, 2024
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (July 8, 2024)
E-0007Address patient/client population and determine types of services needed.Deficient, Provider has date of correction (July 8, 2024)
E-0015Address subsistence needs for staff and patients.Deficient, Provider has date of correction (July 8, 2024)
E-0024Establish policies and procedures for volunteers.Deficient, Provider has date of correction (July 8, 2024)
E-0025Create arrangements with other facilities to receive patients.Deficient, Provider has date of correction (July 8, 2024)
E-0026Establish roles under a Waiver declared by secretary.Deficient, Provider has date of correction (July 8, 2024)
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (July 8, 2024)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (July 8, 2024)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (July 8, 2024)
K-0281Install proper backup exit lighting.Deficient, Provider has date of correction (July 8, 2024)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (July 8, 2024)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (July 8, 2024)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (July 8, 2024)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (July 8, 2024)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (July 8, 2024)
K-0346Follow proper procedures when the fire alarm was out of service for more than 4 hours.Deficient, Provider has date of correction (July 8, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (July 8, 2024)
K-0354Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours.Deficient, Provider has date of correction (July 8, 2024)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (July 8, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (July 8, 2024)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (July 8, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (July 8, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (July 8, 2024)
K-0927Have proper fire barriers, ventilation and signs for the transfilling of oxygen.Deficient, Provider has date of correction (July 8, 2024)

May 4, 2023 — 10 citations

Citations issued on May 4, 2023
TagWhat the surveyor checksStatus
E-0015Address subsistence needs for staff and patients.Deficient, Provider has date of correction (May 26, 2023)
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (May 26, 2023)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (May 26, 2023)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (May 26, 2023)
K-0346Follow proper procedures when the fire alarm was out of service for more than 4 hours.Deficient, Provider has date of correction (May 26, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (May 26, 2023)
K-0354Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours.Deficient, Provider has date of correction (May 26, 2023)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (May 26, 2023)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (May 26, 2023)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (May 26, 2023)

April 7, 2022 — 6 citations

Citations issued on April 7, 2022
TagWhat the surveyor checksStatus
K-0281Install proper backup exit lighting.Deficient, Provider has date of correction (April 25, 2022)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (April 25, 2022)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (April 25, 2022)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (April 25, 2022)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (April 25, 2022)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (April 25, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.