BELLA TERRA MORTON GROVE
MORTON GROVE, IL · 211 certified beds · Last Life Safety survey April 17, 2025
CMS Certification Number 145198 · first certified February 1969
Ownership
Operated by LEGACY HEALTHCARE · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within IL
26 citations — more than 76% of the 666 certified nursing homes in IL. Compared within IL rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 7 citations; the earlier surveys in the window averaged 9.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (March 2026 to May 2026), and past the point by which nine in ten IL facilities have been surveyed. This facility’s last Life Safety survey was April 2025. Facilities in IL are typically surveyed 11–13 months after the last one (median 12), measured over 759 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about BELLA TERRA MORTON GROVE
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
9 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 26 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in IL, and nationally. Surveyors differ markedly between states, so the IL figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 26 |
| Median facility in IL | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 31, 2023 | 11 |
| April 19, 2024 | 8 |
| April 17, 2025 | 7 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 3 | 2025-04-17 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 2 | 2024-04-19 |
| K-0133 | Install a two-hour-resistant firewall separation. | 2 | 2025-04-17 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2024-04-19 |
| K-0293 | Have properly located and lighted "Exit" signs. | 2 | 2025-04-17 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2025-04-17 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2025-04-17 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2025-04-17 |
What the citations cover
- Smoke Deficiencies 12
- Egress Deficiencies 7
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Construction Deficiencies 2
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 12 |
| Egress Deficiencies | 7 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Construction Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 17, 2025 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0133 | Install a two-hour-resistant firewall separation. | Deficient, Provider has date of correction (April 22, 2025) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (April 22, 2025) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (April 22, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 22, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Waiver has been granted (May 27, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 28, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (April 22, 2025) |
April 19, 2024 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (May 1, 2024) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (May 1, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (May 1, 2024) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (May 1, 2024) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (May 1, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (May 1, 2024) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (May 1, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (May 1, 2024) |
March 31, 2023 — 11 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0133 | Install a two-hour-resistant firewall separation. | Deficient, Provider has date of correction (April 30, 2023) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (April 30, 2023) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (April 30, 2023) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (April 30, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 30, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (May 25, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 15, 2023) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (April 30, 2023) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (April 30, 2023) |
| K-0781 | Have restrictions on the use of portable space heaters. | Deficient, Provider has date of correction (April 30, 2023) |
| K-0909 | Ensure gas and vacuum piping is labeled. | Deficient, Provider has date of correction (April 30, 2023) |