Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

LOFT REHAB & NURSING OF NORMAL

NORMAL, IL · 116 certified beds · Last Life Safety survey October 9, 2024

CMS Certification Number 145031 · first certified January 1967

Ownership

Operated by THE LOFT REHABILITATION AND NURSING · For profit - Limited Liability company

  • Ownership changed December 1, 2018 (change of ownership)to LOFT REHABILITATION AND NURSING OF NORMAL from HEARTLAND OF NORMAL IL LLC
25
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
5
Tags cited more than once
Across separate surveys
15
Inspection & testing records
Of the citations on file

Position within IL

25 citations — more than 74% of the 666 certified nursing homes in IL. Compared within IL rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 3 citations; the earlier surveys in the window averaged 11. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Well past the typical window (September 2025 to November 2025), and past the point by which nine in ten IL facilities have been surveyed. This facility’s last Life Safety survey was October 2024. Facilities in IL are typically surveyed 11–13 months after the last one (median 12), measured over 759 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about LOFT REHAB & NURSING OF NORMAL

One email when it happens. No account; stop it any time with one click.

Which alerts

4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

7 of the 25 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

15 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 25 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.

How that compares

Citations on file over three years

Compared with the median facility in IL, and nationally. Surveyors differ markedly between states, so the IL figure is the meaningful one.

This facility25IL median15National median11
Citations on file over three years, compared
MeasureCitations
This facility25
Median facility in IL15
Median facility nationally11

Survey history

Citations at each Life Safety survey
102022-12122023-0932024-10
Citations at each Life Safety survey
Survey dateCitations
December 16, 202210
September 27, 202312
October 9, 20243

Most-cited tags

Most-cited tags at this facility
K-03212K-03552K-03532K-07122K-09182K-03721E-00291K-02911
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.22023-09-27
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.22024-10-09
K-0353Inspect, test, and maintain automatic sprinkler systems.22023-09-27
K-0712Have simulated fire drills held at unexpected times.22023-09-27
K-0918Have generator or other power source capable of supplying service within 10 seconds.22023-09-27
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12024-10-09
E-0029Develop a communication plan.12023-09-27
K-0291Install emergency lighting that can last at least 1 1/2 hours.12022-12-16

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 10
  • Emergency Preparedness Deficiencies 7
  • Gas, Vacuum, and Electrical Systems Deficiencies 4
  • Miscellaneous Deficiencies 2
  • Other 2
Citations by CMS category
CategoryCitations
Smoke Deficiencies10
Emergency Preparedness Deficiencies7
Gas, Vacuum, and Electrical Systems Deficiencies4
Miscellaneous Deficiencies2
Services Deficiencies1
Egress Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

October 9, 2024 — 3 citations

Citations issued on October 9, 2024
TagWhat the surveyor checksStatus
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (October 14, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (October 14, 2024)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (October 25, 2024)

September 27, 2023 — 12 citations

Citations issued on September 27, 2023
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (October 16, 2023)
E-0013Develop Emergency Preparedness policies and procedures.Deficient, Provider has date of correction (October 16, 2023)
E-0029Develop a communication plan.Deficient, Provider has date of correction (October 16, 2023)
E-0036Establish emergency prep training and testing.Deficient, Provider has date of correction (October 16, 2023)
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (October 16, 2023)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (October 16, 2023)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (October 25, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (October 19, 2023)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (October 16, 2023)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (October 19, 2023)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (October 17, 2023)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (October 16, 2023)

December 16, 2022 — 10 citations

Citations issued on December 16, 2022
TagWhat the surveyor checksStatus
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (January 13, 2023)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (January 20, 2023)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (January 13, 2023)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (January 13, 2023)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (January 13, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (January 13, 2023)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (January 13, 2023)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (January 13, 2023)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (January 19, 2023)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (January 13, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.