Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
ASCENSION LIVING SACRED HEART VILLAGE
AVILLA, IN · 133 certified beds · Last Life Safety survey January 9, 2026
CMS Certification Number 155512 · first certified May 1994
Ownership
Operated by ASCENSION LIVING · Non profit - Church related
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within IN
15 citations — more than 48% of the 507 certified nursing homes in IN. Compared within IN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 4. With 4 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens December 2026 — about 3 months from now. This facility’s last Life Safety survey was January 2026. Facilities in IN are typically surveyed 11–14 months after the last one (median 13), measured over 883 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about ASCENSION LIVING SACRED HEART VILLAGE
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 15 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 15 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in IN, and nationally. Surveyors differ markedly between states, so the IN figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 15 |
| Median facility in IN | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 28, 2023 | 1 |
| January 8, 2024 | 5 |
| December 19, 2024 | 6 |
| January 9, 2026 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0361 | Ensure that waiting areas, nurse’s stations, gift shops, and cooking facilities, open to the corridor are properly protected. | 2 | 2024-12-19 |
| K-0927 | Have proper fire barriers, ventilation and signs for the transfilling of oxygen. | 2 | 2024-12-19 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2024-12-19 |
| K-0324 | Provide properly protected cooking facilities. | 2 | 2026-01-09 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2026-01-09 |
| E-0015 | Address subsistence needs for staff and patients. | 1 | 2024-01-08 |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 1 | 2023-08-28 |
| K-0754 | Provide properly sized and located linen or trash receptacles. | 1 | 2024-12-19 |
What the citations cover
- Smoke Deficiencies 8
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Services Deficiencies 1
- Miscellaneous Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 8 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Services Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
| Emergency Preparedness Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 9, 2026 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (February 20, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (March 2, 2026) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (February 20, 2026) |
December 19, 2024 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (March 5, 2025) |
| K-0361 | Ensure that waiting areas, nurse’s stations, gift shops, and cooking facilities, open to the corridor are properly protected. | Deficient, Provider has date of correction (March 5, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (March 5, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (March 5, 2025) |
| K-0754 | Provide properly sized and located linen or trash receptacles. | Deficient, Provider has date of correction (March 5, 2025) |
| K-0927 | Have proper fire barriers, ventilation and signs for the transfilling of oxygen. | Deficient, Provider has date of correction (March 5, 2025) |
January 8, 2024 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (March 1, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (March 1, 2024) |
| K-0361 | Ensure that waiting areas, nurse’s stations, gift shops, and cooking facilities, open to the corridor are properly protected. | Deficient, Provider has date of correction (March 1, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (March 1, 2024) |
| K-0927 | Have proper fire barriers, ventilation and signs for the transfilling of oxygen. | Deficient, Provider has date of correction (March 1, 2024) |
August 28, 2023 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (October 2, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.