Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

COLBY OPERATOR, LLC

COLBY, KS · 40 certified beds · Last Life Safety survey June 11, 2025

CMS Certification Number 175202 · first certified April 1991

Ownership

Operated by MISSION HEALTH COMMUNITIES · For profit - Partnership

No change of ownership on CMS record since January 1, 2016, when the records begin.

37
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
10
Tags cited more than once
Across separate surveys
18
Inspection & testing records
Of the citations on file

Position within KS

37 citations — more than 80% of the 296 certified nursing homes in KS. Compared within KS rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 9 citations; the earlier surveys in the window averaged 14. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens February 2027 — about 4 months from now. This facility’s last Life Safety survey was June 2025. Facilities in KS are typically surveyed 20–22 months after the last one (median 21), measured over 298 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about COLBY OPERATOR, LLC

One email when it happens. No account; stop it any time with one click.

Which alerts

6 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

5 of the 37 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 37 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.

How that compares

Citations on file over three years

Compared with the median facility in KS, and nationally. Surveyors differ markedly between states, so the KS figure is the meaningful one.

This facility37KS median27National median11
Citations on file over three years, compared
MeasureCitations
This facility37
Median facility in KS27
Median facility nationally11

Survey history

Citations at each Life Safety survey
152022-05132023-0992025-06
Citations at each Life Safety survey
Survey dateCitations
May 12, 202215
September 28, 202313
June 11, 20259

Most-cited tags

Most-cited tags at this facility
K-02223K-07123K-03213K-05113K-09203K-03452K-03722K-02112
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.32025-06-11
K-0712Have simulated fire drills held at unexpected times.32025-06-11
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.32025-06-11
K-0511Have properly installed electrical wiring and gas equipment.32025-06-11
K-0920Ensure proper usage of power strips and extension cords.32025-06-11
K-0345Have approved installation, maintenance and testing program for fire alarm systems.22025-06-11
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.22023-09-28
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.22023-09-28

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 13
  • Egress Deficiencies 6
  • Emergency Preparedness Deficiencies 5
  • Miscellaneous Deficiencies 5
  • Other 8
Citations by CMS category
CategoryCitations
Smoke Deficiencies13
Egress Deficiencies6
Emergency Preparedness Deficiencies5
Miscellaneous Deficiencies5
Gas, Vacuum, and Electrical Systems Deficiencies4
Services Deficiencies3
Electrical Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

June 11, 2025 — 9 citations

Citations issued on June 11, 2025
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (August 7, 2025)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (August 7, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (August 7, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (August 7, 2025)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (August 7, 2025)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (August 7, 2025)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (August 7, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (August 7, 2025)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (August 7, 2025)

September 28, 2023 — 13 citations

Citations issued on September 28, 2023
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (December 15, 2023)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (December 15, 2023)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (December 15, 2023)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (December 15, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (December 15, 2023)
K-0362Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.Deficient, Provider has date of correction (December 15, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (December 15, 2023)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (December 15, 2023)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (December 15, 2023)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (December 15, 2023)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (December 15, 2023)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (December 15, 2023)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (December 15, 2023)

May 12, 2022 — 15 citations

Citations issued on May 12, 2022
TagWhat the surveyor checksStatus
E-0001Establish an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (June 17, 2022)
E-0013Develop Emergency Preparedness policies and procedures.Deficient, Provider has date of correction (June 17, 2022)
E-0029Develop a communication plan.Deficient, Provider has date of correction (June 17, 2022)
E-0036Establish emergency prep training and testing.Deficient, Provider has date of correction (June 17, 2022)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (June 17, 2022)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (June 17, 2022)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (June 17, 2022)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (June 17, 2022)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (June 17, 2022)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (June 17, 2022)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (June 17, 2022)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (June 17, 2022)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (June 17, 2022)
K-0901Ensure that building systems meet requirements determined by risk assessment procedures performed by qualified personnel.Deficient, Provider has date of correction (June 17, 2022)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (June 17, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.