Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
PARKVIEW HEIGHTS NURSING AND REHABILITATION CENTER
GARNETT, KS · 45 certified beds · Last Life Safety survey May 21, 2026
CMS Certification Number 175433 · first certified April 1998
Ownership
Operated by RECOVER-CARE HEALTHCARE · For profit - Corporation
- Ownership changed June 1, 2023 (change of ownership)from VSL GARNETT LLC
Position within KS
18 citations — more than 18% of the 296 certified nursing homes in KS. Compared within KS rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 7.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens January 2028 — about 15 months from now. This facility’s last Life Safety survey was May 2026. Facilities in KS are typically surveyed 20–22 months after the last one (median 21), measured over 298 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about PARKVIEW HEIGHTS NURSING AND REHABILITATION CENTER
One email when it happens. No account; stop it any time with one click.
4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 18 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 18 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in KS, and nationally. Surveyors differ markedly between states, so the KS figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 18 |
| Median facility in KS | 27 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| December 8, 2022 | 8 |
| August 14, 2024 | 7 |
| May 21, 2026 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 3 | 2026-05-21 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 2 | 2026-05-21 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2024-08-14 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2024-08-14 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2026-05-21 |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | 1 | 2022-12-08 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2022-12-08 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-08-14 |
What the citations cover
- Smoke Deficiencies 6
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Miscellaneous Deficiencies 3
- Services Deficiencies 2
- Other 3
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Miscellaneous Deficiencies | 3 |
| Services Deficiencies | 2 |
| Egress Deficiencies | 2 |
| Emergency Preparedness Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 21, 2026 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (June 24, 2026) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (June 24, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 24, 2026) |
August 14, 2024 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (September 10, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Waiver has been granted (October 4, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (September 10, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (September 10, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (September 10, 2024) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Waiver has been granted (October 31, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 10, 2024) |
December 8, 2022 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (February 22, 2023) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (February 22, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (February 22, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (February 22, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (February 22, 2023) |
| K-0753 | Have restrictions on the use of highly flammable decorations. | Deficient, Provider has date of correction (February 22, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (February 22, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (February 22, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.