Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
PINNACLE PARK NURSING & REHAB CENTER
SALINA, KS · 60 certified beds · Last Life Safety survey June 10, 2026
CMS Certification Number 175184 · first certified May 1989
Ownership
Operated by RECOVER-CARE HEALTHCARE · For profit - Corporation
- Ownership changed March 16, 2020 (change of ownership)to PINNACLE PARK NURSING & REHABILITATION from PINNACLE HEALTH FACILITIES XVIII LP
Position within KS
20 citations — more than 23% of the 296 certified nursing homes in KS. Compared within KS rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 8. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens February 2028 — about 16 months from now. This facility’s last Life Safety survey was June 2026. Facilities in KS are typically surveyed 20–22 months after the last one (median 21), measured over 298 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about PINNACLE PARK NURSING & REHAB CENTER
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
2 of the 20 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 20 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in KS, and nationally. Surveyors differ markedly between states, so the KS figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 20 |
| Median facility in KS | 27 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 6, 2022 | 10 |
| July 24, 2024 | 6 |
| June 10, 2026 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2026-06-10 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2026-06-10 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2024-07-24 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2026-06-10 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2024-07-24 |
| E-0024 | Establish policies and procedures for volunteers. | 1 | 2022-07-06 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2022-07-06 |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | 1 | 2022-07-06 |
What the citations cover
- Smoke Deficiencies 8
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Miscellaneous Deficiencies 3
- Emergency Preparedness Deficiencies 2
- Other 3
| Category | Citations |
|---|---|
| Smoke Deficiencies | 8 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Miscellaneous Deficiencies | 3 |
| Emergency Preparedness Deficiencies | 2 |
| Services Deficiencies | 2 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 10, 2026 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has no plan of correction |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has no plan of correction |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has no plan of correction |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has no plan of correction |
July 24, 2024 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (October 4, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 4, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (October 4, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (October 4, 2024) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (October 4, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (October 4, 2024) |
July 6, 2022 — 10 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0007 | Address patient/client population and determine types of services needed. | Deficient, Provider has date of correction (September 9, 2022) |
| E-0024 | Establish policies and procedures for volunteers. | Deficient, Provider has date of correction (September 9, 2022) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (September 9, 2022) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 9, 2022) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (September 9, 2022) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (September 9, 2022) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (September 9, 2022) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (September 9, 2022) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 9, 2022) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (September 9, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.