Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
CRESTVIEW NURSING & RESIDENTIAL LIVING
SENECA, KS · 34 certified beds · Last Life Safety survey October 24, 2024
CMS Certification Number 175426 · first certified April 1998
Ownership
Independently operated (no chain recorded by CMS) · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within KS
19 citations — more than 20% of the 296 certified nursing homes in KS. Compared within KS rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys in the window averaged 7. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (June 2026 to August 2026), and past the point by which nine in ten KS facilities have been surveyed. This facility’s last Life Safety survey was October 2024. Facilities in KS are typically surveyed 20–22 months after the last one (median 21), measured over 298 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about CRESTVIEW NURSING & RESIDENTIAL LIVING
One email when it happens. No account; stop it any time with one click.
4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 19 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 19 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in KS, and nationally. Surveyors differ markedly between states, so the KS figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 19 |
| Median facility in KS | 27 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 4, 2021 | 7 |
| April 19, 2023 | 7 |
| October 24, 2024 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2024-10-24 |
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2024-10-24 |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | 2 | 2023-04-19 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2024-10-24 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 2 | 2023-04-19 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 2 | 2023-04-19 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2023-04-19 |
| K-0161 | Use approved construction type or materials. | 1 | 2024-10-24 |
What the citations cover
- Smoke Deficiencies 8
- Egress Deficiencies 4
- Miscellaneous Deficiencies 4
- Electrical Deficiencies 1
- Other 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 8 |
| Egress Deficiencies | 4 |
| Miscellaneous Deficiencies | 4 |
| Electrical Deficiencies | 1 |
| Emergency Preparedness Deficiencies | 1 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
October 24, 2024 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (December 13, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (December 10, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 12, 2024) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (December 30, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (December 10, 2024) |
April 19, 2023 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0901 | Ensure that building systems meet requirements determined by risk assessment procedures performed by qualified personnel. | Deficient, Provider has date of correction (April 28, 2023) |
November 4, 2021 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (January 10, 2022) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (January 10, 2022) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (January 10, 2022) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (January 10, 2022) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (January 10, 2022) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (January 10, 2022) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (January 10, 2022) |