Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

CHEROKEE PARK REHABILITATION

Louisville, KY · 104 certified beds · Last Life Safety survey July 9, 2025

CMS Certification Number 185237 · first certified February 1991

Ownership

Operated by SIMCHA HYMAN & NAFTALI ZANZIPER · For profit - Limited Liability company

  • Ownership changed February 1, 2018 (change of ownership)from LP LOUISVILLE CHEROKEE PARK LLC
11
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
5
Inspection & testing records
Of the citations on file

Position within KY

11 citations — more than 66% of the 267 certified nursing homes in KY. Compared within KY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 2 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: August 2026 to June 2030. This facility’s last Life Safety survey was July 2025. Facilities in KY are typically surveyed 14–59 months after the last one (median 28), measured over 391 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about CHEROKEE PARK REHABILITATION

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.

How that compares

Citations on file over three years

Compared with the median facility in KY, and nationally. Surveyors differ markedly between states, so the KY figure is the meaningful one.

This facility11KY median7National median11
Citations on file over three years, compared
MeasureCitations
This facility11
Median facility in KY7
Median facility nationally11

Survey history

Citations at each Life Safety survey
12019-0282024-0622025-07
Citations at each Life Safety survey
Survey dateCitations
February 28, 20191
June 14, 20248
July 9, 20252

Most-cited tags

Most-cited tags at this facility
K-03722K-09201K-05411K-03531K-03551K-03211K-07411K-03511
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.22025-07-09
K-0920Ensure proper usage of power strips and extension cords.12024-06-14
K-0541Install properly constructed and protected linen or trash chutes.12025-07-09
K-0353Inspect, test, and maintain automatic sprinkler systems.12024-06-14
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.12019-02-28
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12024-06-14
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.12024-06-14
K-0351Install an approved automatic sprinkler system.12024-06-14

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 7
  • Gas, Vacuum, and Electrical Systems Deficiencies 2
  • Services Deficiencies 1
  • Miscellaneous Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies7
Gas, Vacuum, and Electrical Systems Deficiencies2
Services Deficiencies1
Miscellaneous Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

July 9, 2025 — 2 citations

Citations issued on July 9, 2025
TagWhat the surveyor checksStatus
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (August 2, 2025)
K-0541Install properly constructed and protected linen or trash chutes.Deficient, Provider has date of correction (July 10, 2025)

June 14, 2024 — 8 citations

Citations issued on June 14, 2024
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (August 5, 2024)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (August 5, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (August 5, 2024)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (August 5, 2024)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (August 5, 2024)
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.Deficient, Provider has date of correction (August 5, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (August 5, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (August 5, 2024)

February 28, 2019 — 1 citation

Citations issued on February 28, 2019
TagWhat the surveyor checksStatus
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (April 9, 2019)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.