Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Treyton Oak Towers

Louisville, KY · 60 certified beds · Last Life Safety survey July 2, 2026

CMS Certification Number 185175 · first certified July 1984

Ownership

Independently operated (no chain recorded by CMS) · Non profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

7
Citations on file
CMS's current file
3
Life Safety surveys
CMS's current file
1
Tags cited more than once
Across separate surveys
1
Inspection & testing records
Of the citations on file

Position within KY

7 citations — more than 43% of the 266 certified nursing homes in KY. Compared within KY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in CMS's current file.

The latest survey found 2 citations; the earlier surveys on file averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens July 2027 — about 9 months from now. This facility’s last Life Safety survey was July 2026. Facilities in KY are typically surveyed 13–49 months after the last one (median 16), measured over 414 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured

Get an email about Treyton Oak Towers

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

2 of the 7 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 7 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.

How that compares

Citations in CMS's current file

Compared with the median facility in KY, and nationally. Surveyors differ markedly between states, so the KY figure is the meaningful one.

This facility7KY median8National median11
Citations in CMS's current file, compared
MeasureCitations
This facility7
Median facility in KY8
Median facility nationally11

Survey history

Citations at each Life Safety survey
02021-0652025-0722026-07
Citations at each Life Safety survey
Survey dateCitations
June 24, 20210
July 3, 20255
July 2, 20262

Most-cited tags

Most-cited tags at this facility
K-09202K-09141E-00371K-03631K-03211E-00261
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0920Ensure proper usage of power strips and extension cords.22026-07-02
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.12025-07-03
E-0037Establish staff and initial training requirements.12026-07-02
K-0363Install corridor and hallway doors that block smoke.12025-07-03
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12025-07-03
E-0026Establish roles under a Waiver declared by secretary.12025-07-03

What the citations cover

Citations by CMS category
  • Gas, Vacuum, and Electrical Systems Deficiencies 3
  • Emergency Preparedness Deficiencies 2
  • Smoke Deficiencies 2
Citations by CMS category
CategoryCitations
Gas, Vacuum, and Electrical Systems Deficiencies3
Emergency Preparedness Deficiencies2
Smoke Deficiencies2

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

July 2, 2026 — 2 citations

Citations issued on July 2, 2026
TagWhat the surveyor checksStatus
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (August 20, 2026)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (August 20, 2026)

July 3, 2025 — 5 citations

Citations issued on July 3, 2025
TagWhat the surveyor checksStatus
E-0026Establish roles under a Waiver declared by secretary.Deficient, Provider has date of correction (September 12, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (August 24, 2025)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (August 24, 2025)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (August 24, 2025)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (August 24, 2025)

Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.