Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Avalon Place
MONROE, LA · 113 certified beds · Last Life Safety survey December 3, 2025
CMS Certification Number 195492 · first certified July 2000
Ownership
Operated by PARAMOUNT HEALTHCARE CONSULTANTS · For profit - Partnership
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within LA
9 citations — more than 94% of the 265 certified nursing homes in LA. Compared within LA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens November 2026 — about 2 months from now. This facility’s last Life Safety survey was December 2025. Facilities in LA are typically surveyed 12–13 months after the last one (median 13), measured over 458 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Avalon Place
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 9 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in LA, and nationally. Surveyors differ markedly between states, so the LA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 9 |
| Median facility in LA | 2 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| October 11, 2023 | 6 |
| October 16, 2024 | 1 |
| December 3, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 2 | 2024-10-16 |
| K-0331 | Construct fire resistant interior walls. | 1 | 2023-10-11 |
| K-0912 | Have power receptacles that are properly grounded. | 1 | 2023-10-11 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2023-10-11 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2025-12-03 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2023-10-11 |
| K-0919 | Meet requirements for the use of electrical equipment. | 1 | 2025-12-03 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2023-10-11 |
What the citations cover
- Smoke Deficiencies 4
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Services Deficiencies 2
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Services Deficiencies | 2 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
December 3, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (January 13, 2026) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (January 13, 2026) |
October 16, 2024 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has plan of correction (October 29, 2024) |
October 11, 2023 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (November 21, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (November 21, 2023) |
| K-0331 | Construct fire resistant interior walls. | Deficient, Provider has date of correction (November 21, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (November 21, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (November 21, 2023) |
| K-0912 | Have power receptacles that are properly grounded. | Deficient, Provider has date of correction (November 21, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.