Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Chateau De Notre Dame Community Care Center
New Orleans, LA · 171 certified beds · Last Life Safety survey June 4, 2025
CMS Certification Number 195589 · first certified February 2004
Ownership
Operated by COMMCARE CORPORATION · Non profit - Corporation
- Ownership changed June 14, 2023 (change of ownership)from NOTRE DAME HEALTH SYSTEM
Position within LA
6 citations — more than 84% of the 265 certified nursing homes in LA. Compared within LA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 0 citations; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (May 2026 to July 2026), and past the point by which nine in ten LA facilities have been surveyed. This facility’s last Life Safety survey was June 2025. Facilities in LA are typically surveyed 12–13 months after the last one (median 13), measured over 458 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Chateau De Notre Dame Community Care Center
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 6 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in LA, and nationally. Surveyors differ markedly between states, so the LA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 6 |
| Median facility in LA | 2 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 3, 2023 | 4 |
| June 13, 2024 | 2 |
| June 4, 2025 | 0 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2023-08-03 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2024-06-13 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2023-08-03 |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | 1 | 2023-08-03 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2024-06-13 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2023-08-03 |
What the citations cover
- Smoke Deficiencies 3
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Miscellaneous Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 13, 2024 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (July 12, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (July 12, 2024) |
August 3, 2023 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (September 15, 2023) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (September 15, 2023) |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | Waiver has been granted (October 23, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Waiver has been granted (October 23, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.