Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
RAYVILLE NURSING AND REHABILITATION
RAYVILLE, LA · 149 certified beds · Last Life Safety survey August 20, 2025
CMS Certification Number 195373 · first certified June 1996
Ownership
Operated by PARAMOUNT HEALTHCARE CONSULTANTS · For profit - Limited Liability company
- Ownership changed December 1, 2022 (change of ownership)from RNRC PROPERTIES, INC
Position within LA
9 citations — more than 94% of the 265 certified nursing homes in LA. Compared within LA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: August 2026 to September 2026. This facility’s last Life Safety survey was August 2025. Facilities in LA are typically surveyed 12–13 months after the last one (median 13), measured over 458 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about RAYVILLE NURSING AND REHABILITATION
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 9 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0908 Keep all essential equipment working safely.
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in LA, and nationally. Surveyors differ markedly between states, so the LA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 9 |
| Median facility in LA | 2 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 23, 2023 | 3 |
| July 31, 2024 | 4 |
| August 20, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2024-07-31 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2023-08-23 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2023-08-23 |
| K-0133 | Install a two-hour-resistant firewall separation. | 1 | 2024-07-31 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2024-07-31 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2025-08-20 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2023-08-23 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2025-08-20 |
What the citations cover
- Egress Deficiencies 3
- Construction Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Smoke Deficiencies 2
| Category | Citations |
|---|---|
| Egress Deficiencies | 3 |
| Construction Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Smoke Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 20, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (October 3, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (October 3, 2025) |
July 31, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0100 | Meet other general requirements. | Deficient, Provider has date of correction (August 12, 2024) |
| K-0133 | Install a two-hour-resistant firewall separation. | Deficient, Provider has date of correction (October 1, 2024) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (October 1, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 12, 2024) |
August 23, 2023 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (September 29, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (September 29, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (September 29, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.