Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
BELMONT MANOR NURSING HOME, IN
BELMONT, MA · 156 certified beds · Last Life Safety survey December 31, 2025
CMS Certification Number 225419 · first certified July 1990
Ownership
Independently operated (no chain recorded by CMS) · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MA
20 citations — more than 79% of the 341 certified nursing homes in MA. Compared within MA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 8.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens December 2026 — about 3 months from now. This facility’s last Life Safety survey was December 2025. Facilities in MA are typically surveyed 12–15 months after the last one (median 13), measured over 556 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about BELMONT MANOR NURSING HOME, IN
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
6 of the 20 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 20 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in MA, and nationally. Surveyors differ markedly between states, so the MA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 20 |
| Median facility in MA | 11 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| December 29, 2023 | 4 |
| December 5, 2024 | 13 |
| December 31, 2025 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 3 | 2025-12-31 |
| K-0324 | Provide properly protected cooking facilities. | 2 | 2025-12-31 |
| K-0781 | Have restrictions on the use of portable space heaters. | 1 | 2024-12-05 |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | 1 | 2024-12-05 |
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | 1 | 2024-12-05 |
| E-0041 | Implement emergency and standby power systems. | 1 | 2024-12-05 |
| E-0013 | Develop Emergency Preparedness policies and procedures. | 1 | 2024-12-05 |
| E-0036 | Establish emergency prep training and testing. | 1 | 2024-12-05 |
What the citations cover
- Emergency Preparedness Deficiencies 6
- Smoke Deficiencies 5
- Miscellaneous Deficiencies 4
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Other 2
| Category | Citations |
|---|---|
| Emergency Preparedness Deficiencies | 6 |
| Smoke Deficiencies | 5 |
| Miscellaneous Deficiencies | 4 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Services Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
December 31, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (February 27, 2026) |
| K-0541 | Install properly constructed and protected linen or trash chutes. | Deficient, Provider has date of correction (March 19, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (March 19, 2026) |
December 5, 2024 — 13 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (December 30, 2024) |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (December 30, 2024) |
| E-0013 | Develop Emergency Preparedness policies and procedures. | Deficient, Provider has date of correction (December 30, 2024) |
| E-0029 | Develop a communication plan. | Deficient, Provider has date of correction (December 30, 2024) |
| E-0036 | Establish emergency prep training and testing. | Deficient, Provider has date of correction (December 30, 2024) |
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (December 30, 2024) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (December 30, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (December 30, 2024) |
| K-0352 | Properly install and monitor supervisory attachments on automatic sprinkler systems. | Deficient, Provider has date of correction (January 6, 2025) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (December 30, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (December 30, 2024) |
| K-0781 | Have restrictions on the use of portable space heaters. | Deficient, Provider has date of correction (December 30, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (December 30, 2024) |
December 29, 2023 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (February 6, 2024) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (February 6, 2024) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (February 6, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (February 6, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.