Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

ROYAL BRAINTREE NURSING AND REHABILITATION CENTER

BRAINTREE, MA · 204 certified beds · Last Life Safety survey February 11, 2026

CMS Certification Number 225058 · first certified January 1967

Ownership

Operated by ROYAL HEALTH GROUP · For profit - Limited Liability company

No change of ownership on CMS record since January 1, 2016, when the records begin.

23
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
4
Tags cited more than once
Across separate surveys
7
Inspection & testing records
Of the citations on file

Position within MA

23 citations — more than 87% of the 341 certified nursing homes in MA. Compared within MA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 7 citations; the earlier surveys in the window averaged 8. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens February 2027 — about 4 months from now. This facility’s last Life Safety survey was February 2026. Facilities in MA are typically surveyed 12–15 months after the last one (median 13), measured over 556 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about ROYAL BRAINTREE NURSING AND REHABILITATION CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

4 of the 23 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 23 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in MA, and nationally. Surveyors differ markedly between states, so the MA figure is the meaningful one.

This facility23MA median11National median11
Citations on file over three years, compared
MeasureCitations
This facility23
Median facility in MA11
Median facility nationally11

Survey history

Citations at each Life Safety survey
22023-08142024-1172026-02
Citations at each Life Safety survey
Survey dateCitations
August 3, 20232
November 15, 202414
February 11, 20267

Most-cited tags

Most-cited tags at this facility
K-01613K-02113K-03212K-05412K-03531K-03241K-03111E-00151
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0161Use approved construction type or materials.32026-02-11
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.32026-02-11
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.22026-02-11
K-0541Install properly constructed and protected linen or trash chutes.22026-02-11
K-0353Inspect, test, and maintain automatic sprinkler systems.12026-02-11
K-0324Provide properly protected cooking facilities.12024-11-15
K-0311Have an enclosure around a vertical opening shaft.12026-02-11
E-0015Address subsistence needs for staff and patients.12024-11-15

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 7
  • Emergency Preparedness Deficiencies 4
  • Egress Deficiencies 3
  • Services Deficiencies 3
  • Other 6
Citations by CMS category
CategoryCitations
Smoke Deficiencies7
Emergency Preparedness Deficiencies4
Egress Deficiencies3
Services Deficiencies3
Construction Deficiencies3
Miscellaneous Deficiencies2
Gas, Vacuum, and Electrical Systems Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

February 11, 2026 — 7 citations

Citations issued on February 11, 2026
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (April 17, 2026)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (April 17, 2026)
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (April 17, 2026)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (April 17, 2026)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (May 14, 2026)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (April 17, 2026)
K-0541Install properly constructed and protected linen or trash chutes.Deficient, Provider has date of correction (April 17, 2026)

November 15, 2024 — 14 citations

Citations issued on November 15, 2024
TagWhat the surveyor checksStatus
E-0009Include a process for Emergency Preparedness collaboration.Deficient, Provider has date of correction (January 17, 2025)
E-0015Address subsistence needs for staff and patients.Deficient, Provider has date of correction (January 17, 2025)
E-0026Establish roles under a Waiver declared by secretary.Deficient, Provider has date of correction (January 17, 2025)
E-0032Provide primary/alternate means for communication.Deficient, Provider has date of correction (January 17, 2025)
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (February 10, 2025)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (January 17, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (January 17, 2025)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (January 17, 2025)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (January 17, 2025)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (January 17, 2025)
K-0541Install properly constructed and protected linen or trash chutes.Deficient, Provider has date of correction (January 17, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (January 17, 2025)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (January 17, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (January 17, 2025)

August 3, 2023 — 2 citations

Citations issued on August 3, 2023
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (August 25, 2023)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (August 25, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.