CAPE COD POST ACUTE CARE
BREWSTER, MA · 135 certified beds · Last Life Safety survey June 10, 2026
CMS Certification Number 225667 · first certified February 1995
Ownership
Operated by MARQUIS HEALTH SERVICES · For profit - Limited Liability company
- Ownership changed October 31, 2024 (change of ownership)from PLEASANT BAY OF BREWSTER REHAB CENTER LLC
Position within MA
24 citations — more than 90% of the 341 certified nursing homes in MA. Compared within MA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys on file averaged 11. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens June 2027 — about 7 months from now. This facility’s last Life Safety survey was June 2026. Facilities in MA are typically surveyed 12–14 months after the last one (median 13), measured over 553 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about CAPE COD POST ACUTE CARE
One email when it happens. No account; stop it any time with one click.
Emergency preparedness
9 of the 24 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 24 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in MA, and nationally. Surveyors differ markedly between states, so the MA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 24 |
| Median facility in MA | 11 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 19, 2024 | 17 |
| May 8, 2025 | 5 |
| June 10, 2026 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 2 | 2025-05-08 |
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | 2 | 2025-05-08 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2025-05-08 |
| E-0041 | Implement emergency and standby power systems. | 1 | 2024-03-19 |
| K-0711 | Provide a written emergency evacuation plan. | 1 | 2025-05-08 |
| E-0039 | Conduct testing and exercise requirements. | 1 | 2024-03-19 |
| E-0013 | Develop Emergency Preparedness policies and procedures. | 1 | 2024-03-19 |
| E-0029 | Develop a communication plan. | 1 | 2024-03-19 |
What the citations cover
- Emergency Preparedness Deficiencies 9
- Smoke Deficiencies 6
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Miscellaneous Deficiencies 2
- Other 4
| Category | Citations |
|---|---|
| Emergency Preparedness Deficiencies | 9 |
| Smoke Deficiencies | 6 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Miscellaneous Deficiencies | 2 |
| Egress Deficiencies | 2 |
| Services Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 10, 2026 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 3, 2026) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (July 21, 2026) |
May 8, 2025 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (June 3, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (June 3, 2025) |
| K-0541 | Install properly constructed and protected linen or trash chutes. | Deficient, Provider has date of correction (June 3, 2025) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (June 3, 2025) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (June 3, 2025) |
March 19, 2024 — 17 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (April 25, 2024) |
| E-0013 | Develop Emergency Preparedness policies and procedures. | Deficient, Provider has date of correction (April 25, 2024) |
| E-0022 | Establish policies and procedures for sheltering. | Deficient, Provider has date of correction (April 25, 2024) |
| E-0029 | Develop a communication plan. | Deficient, Provider has date of correction (April 25, 2024) |
| E-0030 | List the names and contact information of those in the facility. | Deficient, Provider has date of correction (April 25, 2024) |
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (April 25, 2024) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (April 25, 2024) |
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (April 25, 2024) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (April 25, 2024) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (April 25, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 25, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (April 25, 2024) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (May 3, 2024) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (April 25, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (April 25, 2024) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (April 25, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 25, 2024) |