Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

FALL RIVER JEWISH HOME

FALL RIVER, MA · 62 certified beds · Last Life Safety survey June 10, 2025

CMS Certification Number 225317 · first certified December 1988

Ownership

Operated by AZURE HEALTHCARE · For profit - Limited Liability company

  • Ownership changed July 1, 2022 (change of ownership)from FALL RIVER JEWISH HOME. INC.
9
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
0
Tags cited more than once
Across separate surveys
3
Inspection & testing records
Of the citations on file

Position within MA

9 citations — more than 39% of the 341 certified nursing homes in MA. Compared within MA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 4 citations; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Well past the typical window (June 2026 to August 2026), and past the point by which nine in ten MA facilities have been surveyed. This facility’s last Life Safety survey was June 2025. Facilities in MA are typically surveyed 12–15 months after the last one (median 13), measured over 556 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about FALL RIVER JEWISH HOME

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

4 of the 9 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 9 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0908 Keep all essential equipment working safely.

How that compares

Citations on file over three years

Compared with the median facility in MA, and nationally. Surveyors differ markedly between states, so the MA figure is the meaningful one.

This facility9MA median11National median11
Citations on file over three years, compared
MeasureCitations
This facility9
Median facility in MA11
Median facility nationally11

Survey history

Citations at each Life Safety survey
02023-0252024-0642025-06
Citations at each Life Safety survey
Survey dateCitations
February 23, 20230
June 13, 20245
June 10, 20254

Most-cited tags

Most-cited tags at this facility
K-07121K-03531E-00131K-03211E-00041E-00361K-09181K-02221
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0712Have simulated fire drills held at unexpected times.12025-06-10
K-0353Inspect, test, and maintain automatic sprinkler systems.12025-06-10
E-0013Develop Emergency Preparedness policies and procedures.12024-06-13
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12024-06-13
E-0004Develop and maintain an Emergency Preparedness Program (EP).12024-06-13
E-0036Establish emergency prep training and testing.12024-06-13
K-0918Have generator or other power source capable of supplying service within 10 seconds.12025-06-10
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.12025-06-10

What the citations cover

Citations by CMS category
  • Emergency Preparedness Deficiencies 4
  • Smoke Deficiencies 2
  • Miscellaneous Deficiencies 1
  • Gas, Vacuum, and Electrical Systems Deficiencies 1
  • Other 1
Citations by CMS category
CategoryCitations
Emergency Preparedness Deficiencies4
Smoke Deficiencies2
Miscellaneous Deficiencies1
Gas, Vacuum, and Electrical Systems Deficiencies1
Egress Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

June 10, 2025 — 4 citations

Citations issued on June 10, 2025
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (June 16, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (June 16, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (June 16, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (July 8, 2025)

June 13, 2024 — 5 citations

Citations issued on June 13, 2024
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (July 16, 2024)
E-0013Develop Emergency Preparedness policies and procedures.Deficient, Provider has date of correction (July 16, 2024)
E-0029Develop a communication plan.Deficient, Provider has date of correction (July 16, 2024)
E-0036Establish emergency prep training and testing.Deficient, Provider has date of correction (July 16, 2024)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (July 16, 2024)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.