Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Bethany Skilled Nursing Facility

FRAMINGHAM, MA · 169 certified beds · Last Life Safety survey June 4, 2025

CMS Certification Number 225535 · first certified May 1991

Ownership

Independently operated (no chain recorded by CMS) · Non profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

7
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
7
Inspection & testing records
Of the citations on file

Position within MA

7 citations — more than 31% of the 341 certified nursing homes in MA. Compared within MA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 4 citations; the earlier surveys in the window averaged 1.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Well past the typical window (June 2026 to August 2026), and past the point by which nine in ten MA facilities have been surveyed. This facility’s last Life Safety survey was June 2025. Facilities in MA are typically surveyed 12–15 months after the last one (median 13), measured over 556 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Bethany Skilled Nursing Facility

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 7 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.

How that compares

Citations on file over three years

Compared with the median facility in MA, and nationally. Surveyors differ markedly between states, so the MA figure is the meaningful one.

This facility7MA median11National median11
Citations on file over three years, compared
MeasureCitations
This facility7
Median facility in MA11
Median facility nationally11

Survey history

Citations at each Life Safety survey
32022-1002024-0442025-06
Citations at each Life Safety survey
Survey dateCitations
October 17, 20223
April 23, 20240
June 4, 20254

Most-cited tags

Most-cited tags at this facility
K-03532K-09181K-03241K-07121K-03721K-02911
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0353Inspect, test, and maintain automatic sprinkler systems.22025-06-04
K-0918Have generator or other power source capable of supplying service within 10 seconds.12025-06-04
K-0324Provide properly protected cooking facilities.12025-06-04
K-0712Have simulated fire drills held at unexpected times.12022-10-17
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12022-10-17
K-0291Install emergency lighting that can last at least 1 1/2 hours.12025-06-04

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 4
  • Egress Deficiencies 1
  • Miscellaneous Deficiencies 1
  • Gas, Vacuum, and Electrical Systems Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies4
Egress Deficiencies1
Miscellaneous Deficiencies1
Gas, Vacuum, and Electrical Systems Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

June 4, 2025 — 4 citations

Citations issued on June 4, 2025
TagWhat the surveyor checksStatus
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (June 23, 2025)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (July 2, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (June 20, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (June 23, 2025)

October 17, 2022 — 3 citations

Citations issued on October 17, 2022
TagWhat the surveyor checksStatus
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (November 25, 2022)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (November 25, 2022)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (November 25, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.