Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

MELROSE HEALTHCARE

MELROSE, MA · 106 certified beds · Last Life Safety survey April 9, 2025

CMS Certification Number 225329 · first certified February 1989

Ownership

Operated by NEXT STEP HEALTHCARE · For profit - Limited Liability company

  • Ownership changed September 1, 2017 (change of ownership)from GGNSC MELROSE CENTER LLC
21
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
4
Tags cited more than once
Across separate surveys
4
Inspection & testing records
Of the citations on file

Position within MA

21 citations — more than 82% of the 341 certified nursing homes in MA. Compared within MA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 6 citations; the earlier surveys in the window averaged 7.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Well past the typical window (April 2026 to June 2026), and past the point by which nine in ten MA facilities have been surveyed. This facility’s last Life Safety survey was April 2025. Facilities in MA are typically surveyed 12–15 months after the last one (median 13), measured over 556 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about MELROSE HEALTHCARE

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

2 of the 21 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 21 Life Safety citations above. The Physical Environment Index

  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in MA, and nationally. Surveyors differ markedly between states, so the MA figure is the meaningful one.

This facility21MA median11National median11
Citations on file over three years, compared
MeasureCitations
This facility21
Median facility in MA11
Median facility nationally11

Survey history

Citations at each Life Safety survey
112023-0242024-0462025-04
Citations at each Life Safety survey
Survey dateCitations
February 7, 202311
April 3, 20244
April 9, 20256

Most-cited tags

Most-cited tags at this facility
K-01613K-02113K-02713K-03113E-00391K-07121K-03211K-03631
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0161Use approved construction type or materials.32025-04-09
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.32025-04-09
K-0271Have exits that are accessible at all times.32025-04-09
K-0311Have an enclosure around a vertical opening shaft.32025-04-09
E-0039Conduct testing and exercise requirements.12023-02-07
K-0712Have simulated fire drills held at unexpected times.12025-04-09
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12023-02-07
K-0363Install corridor and hallway doors that block smoke.12023-02-07

What the citations cover

Citations by CMS category
  • Egress Deficiencies 7
  • Smoke Deficiencies 6
  • Construction Deficiencies 3
  • Miscellaneous Deficiencies 2
  • Other 3
Citations by CMS category
CategoryCitations
Egress Deficiencies7
Smoke Deficiencies6
Construction Deficiencies3
Miscellaneous Deficiencies2
Emergency Preparedness Deficiencies2
Gas, Vacuum, and Electrical Systems Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

April 9, 2025 — 6 citations

Citations issued on April 9, 2025
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (May 29, 2025)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (May 29, 2025)
K-0271Have exits that are accessible at all times.Deficient, Provider has date of correction (May 29, 2025)
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (May 29, 2025)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (May 6, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (May 6, 2025)

April 3, 2024 — 4 citations

Citations issued on April 3, 2024
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (April 15, 2024)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (April 15, 2024)
K-0271Have exits that are accessible at all times.Deficient, Provider has date of correction (April 15, 2024)
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (April 15, 2024)

February 7, 2023 — 11 citations

Citations issued on February 7, 2023
TagWhat the surveyor checksStatus
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (March 21, 2023)
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (March 21, 2023)
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (March 23, 2023)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (March 22, 2023)
K-0271Have exits that are accessible at all times.Deficient, Provider has date of correction (March 22, 2023)
K-0281Install proper backup exit lighting.Deficient, Provider has date of correction (March 21, 2023)
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (March 22, 2023)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (March 21, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (March 21, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (March 21, 2023)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (March 21, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.