Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

SALEM REHAB CENTER

SALEM, MA · 123 certified beds · Last Life Safety survey September 5, 2025

CMS Certification Number 225644 · first certified August 1994

Ownership

Operated by ADVINIACARE · For profit - Corporation

  • Ownership changed June 1, 2019 (change of ownership)to ADVINIACARE AT VINNIN SQUARE from GROSVENOR PARK HEALTH CENTER LLC
15
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
2
Tags cited more than once
Across separate surveys
6
Inspection & testing records
Of the citations on file

Position within MA

15 citations — more than 67% of the 341 certified nursing homes in MA. Compared within MA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 10 citations; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: September 2026 to November 2026. This facility’s last Life Safety survey was September 2025. Facilities in MA are typically surveyed 12–15 months after the last one (median 13), measured over 556 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about SALEM REHAB CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

6 of the 15 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 15 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0926 Have policies on smoking.

How that compares

Citations on file over three years

Compared with the median facility in MA, and nationally. Surveyors differ markedly between states, so the MA figure is the meaningful one.

This facility15MA median11National median11
Citations on file over three years, compared
MeasureCitations
This facility15
Median facility in MA11
Median facility nationally11

Survey history

Citations at each Life Safety survey
42024-0812025-04102025-09
Citations at each Life Safety survey
Survey dateCitations
August 12, 20244
April 17, 20251
September 5, 202510

Most-cited tags

Most-cited tags at this facility
K-09182K-07122E-00061E-00361E-00391K-03451K-02221E-00411
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0918Have generator or other power source capable of supplying service within 10 seconds.22025-04-17
K-0712Have simulated fire drills held at unexpected times.22025-09-05
E-0006Conduct risk assessment and an All-Hazards approach.12025-09-05
E-0036Establish emergency prep training and testing.12025-09-05
E-0039Conduct testing and exercise requirements.12025-09-05
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12025-09-05
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.12025-09-05
E-0041Implement emergency and standby power systems.12024-08-12

What the citations cover

Citations by CMS category
  • Emergency Preparedness Deficiencies 6
  • Smoke Deficiencies 3
  • Miscellaneous Deficiencies 3
  • Gas, Vacuum, and Electrical Systems Deficiencies 2
  • Other 1
Citations by CMS category
CategoryCitations
Emergency Preparedness Deficiencies6
Smoke Deficiencies3
Miscellaneous Deficiencies3
Gas, Vacuum, and Electrical Systems Deficiencies2
Egress Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

September 5, 2025 — 10 citations

Citations issued on September 5, 2025
TagWhat the surveyor checksStatus
E-0006Conduct risk assessment and an All-Hazards approach.Deficient, Provider has date of correction (September 29, 2025)
E-0015Address subsistence needs for staff and patients.Deficient, Provider has date of correction (September 29, 2025)
E-0036Establish emergency prep training and testing.Deficient, Provider has date of correction (September 29, 2025)
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (September 11, 2025)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (October 8, 2025)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (September 29, 2025)
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (October 6, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (September 10, 2025)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (October 6, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (October 10, 2025)

April 17, 2025 — 1 citation

Citations issued on April 17, 2025
TagWhat the surveyor checksStatus
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (May 6, 2025)

August 12, 2024 — 4 citations

Citations issued on August 12, 2024
TagWhat the surveyor checksStatus
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (September 20, 2024)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (September 20, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (September 20, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (September 20, 2024)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.