Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
THE NURSING AND REHAB CENTER AT STADIUM PLACE
BALTIMORE, MD · 49 certified beds · Last Life Safety survey March 11, 2026
CMS Certification Number 215356 · first certified June 2012
Ownership
Operated by LIFEWORKS REHAB · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MD
48 citations — more than 99% of the 221 certified nursing homes in MD. Compared within MD rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 14.7. With 4 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens August 2027 — about 11 months from now. This facility’s last Life Safety survey was March 2026. Facilities in MD are typically surveyed 17–59 months after the last one (median 30), measured over 283 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about THE NURSING AND REHAB CENTER AT STADIUM PLACE
One email when it happens. No account; stop it any time with one click.
7 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
11 of the 48 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
8 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 48 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
- F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.
How that compares
Compared with the median facility in MD, and nationally. Surveyors differ markedly between states, so the MD figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 48 |
| Median facility in MD | 22 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 11, 2019 | 7 |
| January 23, 2023 | 31 |
| July 23, 2025 | 6 |
| March 11, 2026 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0923 | Have proper medical gas storage and administration areas. | 3 | 2025-07-23 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 3 | 2026-03-11 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2023-01-23 |
| K-0324 | Provide properly protected cooking facilities. | 2 | 2023-01-23 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 2 | 2026-03-11 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 2 | 2025-07-23 |
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | 2 | 2025-07-23 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 2 | 2026-03-11 |
What the citations cover
- Smoke Deficiencies 13
- Emergency Preparedness Deficiencies 11
- Egress Deficiencies 7
- Gas, Vacuum, and Electrical Systems Deficiencies 7
- Other 10
| Category | Citations |
|---|---|
| Smoke Deficiencies | 13 |
| Emergency Preparedness Deficiencies | 11 |
| Egress Deficiencies | 7 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 7 |
| Miscellaneous Deficiencies | 5 |
| Services Deficiencies | 3 |
| Construction Deficiencies | 1 |
| Electrical Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 11, 2026 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (April 3, 2026) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (April 3, 2026) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (April 3, 2026) |
| K-0781 | Have restrictions on the use of portable space heaters. | Past Non-Compliance |
July 23, 2025 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (September 29, 2025) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (September 29, 2025) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (September 29, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (September 29, 2025) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (September 29, 2025) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (September 29, 2025) |
January 23, 2023 — 31 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0001 | Establish an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (April 21, 2023) |
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (April 21, 2023) |
| E-0018 | Establish procedures for tracking staff and patients during an emergency. | Deficient, Provider has date of correction (April 21, 2023) |
| E-0025 | Create arrangements with other facilities to receive patients. | Deficient, Provider has date of correction (April 21, 2023) |
| E-0029 | Develop a communication plan. | Deficient, Provider has date of correction (April 21, 2023) |
| E-0030 | List the names and contact information of those in the facility. | Deficient, Provider has date of correction (April 21, 2023) |
| E-0031 | Provide emergency officials' contact information. | Deficient, Provider has date of correction (April 21, 2023) |
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (April 21, 2023) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (April 21, 2023) |
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (April 21, 2023) |
| K-0100 | Meet other general requirements. | Deficient, Provider has date of correction (March 16, 2023) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (March 16, 2023) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (March 16, 2023) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (March 16, 2023) |
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | Deficient, Provider has date of correction (March 16, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (April 7, 2023) |
| K-0325 | Have properly installed hallway dispensers for alcohol-based hand rub. | Deficient, Provider has date of correction (March 16, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (March 16, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 7, 2023) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (March 16, 2023) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (March 16, 2023) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (March 16, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (March 16, 2023) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (March 16, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (April 7, 2023) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (April 21, 2023) |
| K-0901 | Ensure that building systems meet requirements determined by risk assessment procedures performed by qualified personnel. | Deficient, Provider has date of correction (April 7, 2023) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (March 16, 2023) |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | Deficient, Provider has date of correction (March 16, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 21, 2023) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (April 7, 2023) |
March 11, 2019 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (April 22, 2019) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 25, 2019) |
| K-0500 | Meet other general requirements that are deficient. | Deficient, Provider has date of correction (June 18, 2019) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (April 17, 2019) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (April 25, 2019) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (May 29, 2019) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (April 17, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.