Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

MAINEGENERAL REHAB & LONG TERM CARE - GLENRIDGE

AUGUSTA, ME · 125 certified beds · Last Life Safety survey March 26, 2026

CMS Certification Number 205139 · first certified January 1993

Ownership

Independently operated (no chain recorded by CMS) · Non profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

8
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
0
Tags cited more than once
Across separate surveys
2
Inspection & testing records
Of the citations on file

Position within ME

8 citations — more than 13% of the 78 certified nursing homes in ME. Compared within ME rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 2 citations; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens April 2027 — about 7 months from now. This facility’s last Life Safety survey was March 2026. Facilities in ME are typically surveyed 13–15 months after the last one (median 14), measured over 115 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about MAINEGENERAL REHAB & LONG TERM CARE - GLENRIDGE

One email when it happens. No account; stop it any time with one click.

Which alerts

Physical environment (health survey)

3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 8 Life Safety citations above. The Physical Environment Index

  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in ME, and nationally. Surveyors differ markedly between states, so the ME figure is the meaningful one.

This facility8ME median17National median11
Citations on file over three years, compared
MeasureCitations
This facility8
Median facility in ME17
Median facility nationally11

Survey history

Citations at each Life Safety survey
02022-1062025-0122026-03
Citations at each Life Safety survey
Survey dateCitations
October 5, 20220
January 9, 20256
March 26, 20262

Most-cited tags

Most-cited tags at this facility
K-01331K-02221K-03211K-07541K-02911K-03631K-03711K-02111
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0133Install a two-hour-resistant firewall separation.12026-03-26
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.12025-01-09
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12026-03-26
K-0754Provide properly sized and located linen or trash receptacles.12025-01-09
K-0291Install emergency lighting that can last at least 1 1/2 hours.12025-01-09
K-0363Install corridor and hallway doors that block smoke.12025-01-09
K-0371Have properly sized and located compartments to protect residents from smoke.12025-01-09
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12025-01-09

What the citations cover

Citations by CMS category
  • Egress Deficiencies 3
  • Smoke Deficiencies 3
  • Miscellaneous Deficiencies 1
  • Construction Deficiencies 1
Citations by CMS category
CategoryCitations
Egress Deficiencies3
Smoke Deficiencies3
Miscellaneous Deficiencies1
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

March 26, 2026 — 2 citations

Citations issued on March 26, 2026
TagWhat the surveyor checksStatus
K-0133Install a two-hour-resistant firewall separation.Deficient, Provider has date of correction (April 13, 2026)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (April 13, 2026)

January 9, 2025 — 6 citations

Citations issued on January 9, 2025
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (January 7, 2025)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (January 6, 2025)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (January 7, 2025)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (January 8, 2025)
K-0371Have properly sized and located compartments to protect residents from smoke.Deficient, Provider has date of correction (January 24, 2025)
K-0754Provide properly sized and located linen or trash receptacles.Deficient, Provider has date of correction (January 6, 2025)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.