Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
PINE POINT CENTER
SCARBOROUGH, ME · 61 certified beds · Last Life Safety survey July 16, 2026
CMS Certification Number 205070 · first certified October 1991
Ownership
Operated by GENESIS HEALTHCARE · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within ME
10 citations — more than 23% of the 78 certified nursing homes in ME. Compared within ME rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys on file averaged 2. With 5 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens August 2027 — about 9 months from now. This facility’s last Life Safety survey was July 2026. Facilities in ME are typically surveyed 13–15 months after the last one (median 14), measured over 113 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about PINE POINT CENTER
One email when it happens. No account; stop it any time with one click.
Emergency preparedness
1 of the 10 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 10 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0880 Provide and implement an infection prevention and control program.
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
How that compares
Compared with the median facility in ME, and nationally. Surveyors differ markedly between states, so the ME figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 10 |
| Median facility in ME | 17 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 6, 2024 | 1 |
| April 9, 2025 | 5 |
| April 17, 2025 | 1 |
| July 9, 2025 | 1 |
| July 16, 2026 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0271 | Have exits that are accessible at all times. | 2 | 2026-07-16 |
| K-0754 | Provide properly sized and located linen or trash receptacles. | 1 | 2024-03-06 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2025-04-09 |
| K-0919 | Meet requirements for the use of electrical equipment. | 1 | 2025-07-09 |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | 1 | 2025-04-17 |
| E-0039 | Conduct testing and exercise requirements. | 1 | 2025-04-09 |
| K-0753 | Have restrictions on the use of highly flammable decorations. | 1 | 2025-04-09 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2025-04-09 |
What the citations cover
- Egress Deficiencies 3
- Smoke Deficiencies 3
- Miscellaneous Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Egress Deficiencies | 3 |
| Smoke Deficiencies | 3 |
| Miscellaneous Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
| Emergency Preparedness Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
July 16, 2026 — 2 citations
July 9, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (August 25, 2025) |
April 17, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (May 16, 2025) |
April 9, 2025 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (May 23, 2025) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (May 23, 2025) |
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (May 23, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (May 23, 2025) |
| K-0753 | Have restrictions on the use of highly flammable decorations. | Deficient, Provider has date of correction (May 23, 2025) |
March 6, 2024 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0754 | Provide properly sized and located linen or trash receptacles. | Deficient, Provider has date of correction (March 25, 2024) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.