Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
WellBridge of Pinckney
Pinckney, MI · 100 certified beds · Last Life Safety survey June 24, 2026
CMS Certification Number 235720 · first certified January 2017
Ownership
Operated by THE WELLBRIDGE GROUP · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MI
3 citations — more than 5% of the 422 certified nursing homes in MI. Compared within MI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
When is the next survey likely?
The window opens June 2027 — about 9 months from now. This facility’s last Life Safety survey was June 2026. Facilities in MI are typically surveyed 12–14 months after the last one (median 13), measured over 723 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about WellBridge of Pinckney
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 3 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in MI, and nationally. Surveyors differ markedly between states, so the MI figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 3 |
| Median facility in MI | 14 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 13, 2024 | 0 |
| April 3, 2025 | 0 |
| June 24, 2026 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | 1 | 2026-06-24 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2026-06-24 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2026-06-24 |
What the citations cover
- Smoke Deficiencies 2
- Services Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 2 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 24, 2026 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (June 26, 2026) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (June 26, 2026) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (June 26, 2026) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.