Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Applewood Nursing Center, Inc

Woodhaven, MI · 150 certified beds · Last Life Safety survey April 17, 2025

CMS Certification Number 235375 · first certified July 1978

Ownership

Operated by SYMPHONY CARE NETWORK · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

29
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
7
Tags cited more than once
Across separate surveys
15
Inspection & testing records
Of the citations on file

Position within MI

29 citations — more than 89% of the 422 certified nursing homes in MI. Compared within MI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 3 citations; the earlier surveys in the window averaged 13. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Well past the typical window (April 2026 to June 2026), and past the point by which nine in ten MI facilities have been surveyed. This facility’s last Life Safety survey was April 2025. Facilities in MI are typically surveyed 12–14 months after the last one (median 13), measured over 723 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Applewood Nursing Center, Inc

One email when it happens. No account; stop it any time with one click.

Which alerts

3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

1 of the 29 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

7 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 29 Life Safety citations above. The Physical Environment Index

  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0908 Keep all essential equipment working safely.

How that compares

Citations on file over three years

Compared with the median facility in MI, and nationally. Surveyors differ markedly between states, so the MI figure is the meaningful one.

This facility29MI median14National median11
Citations on file over three years, compared
MeasureCitations
This facility29
Median facility in MI14
Median facility nationally11

Survey history

Citations at each Life Safety survey
122023-03142024-0532025-04
Citations at each Life Safety survey
Survey dateCitations
March 29, 202312
May 3, 202414
April 17, 20253

Most-cited tags

Most-cited tags at this facility
K-03533K-03243K-03212K-02112K-09182K-09202K-03512K-03631
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0353Inspect, test, and maintain automatic sprinkler systems.32025-04-17
K-0324Provide properly protected cooking facilities.32025-04-17
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.22024-05-03
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.22024-05-03
K-0918Have generator or other power source capable of supplying service within 10 seconds.22024-05-03
K-0920Ensure proper usage of power strips and extension cords.22025-04-17
K-0351Install an approved automatic sprinkler system.22024-05-03
K-0363Install corridor and hallway doors that block smoke.12024-05-03

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 17
  • Gas, Vacuum, and Electrical Systems Deficiencies 5
  • Egress Deficiencies 2
  • Services Deficiencies 2
  • Other 3
Citations by CMS category
CategoryCitations
Smoke Deficiencies17
Gas, Vacuum, and Electrical Systems Deficiencies5
Egress Deficiencies2
Services Deficiencies2
Miscellaneous Deficiencies2
Emergency Preparedness Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

April 17, 2025 — 3 citations

Citations issued on April 17, 2025
TagWhat the surveyor checksStatus
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (May 12, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (May 12, 2025)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (May 12, 2025)

May 3, 2024 — 14 citations

Citations issued on May 3, 2024
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (June 4, 2024)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (June 4, 2024)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (June 4, 2024)
K-0331Construct fire resistant interior walls.Deficient, Provider has date of correction (June 4, 2024)
K-0342Have a complete alarm system manually initiated and initiated by fire sprinkler system connection.Deficient, Provider has date of correction (June 4, 2024)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (June 4, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (June 4, 2024)
K-0362Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.Deficient, Provider has date of correction (June 4, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (June 4, 2024)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (June 4, 2024)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (June 4, 2024)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (June 4, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (June 4, 2024)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (June 4, 2024)

March 29, 2023 — 12 citations

Citations issued on March 29, 2023
TagWhat the surveyor checksStatus
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (May 2, 2023)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (May 2, 2023)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (May 2, 2023)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (May 2, 2023)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (May 2, 2023)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (May 2, 2023)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (May 2, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (May 2, 2023)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (May 2, 2023)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (May 2, 2023)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (May 2, 2023)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (May 2, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.