Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
GRACEPOINTE CROSSING GABLES
CAMBRIDGE, MN · 110 certified beds · Last Life Safety survey September 4, 2025
CMS Certification Number 245432 · first certified March 1987
Ownership
Operated by PRESBYTERIAN HOMES & SERVICES · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MN
10 citations — more than 38% of the 338 certified nursing homes in MN. Compared within MN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: August 2026 to November 2026. This facility’s last Life Safety survey was September 2025. Facilities in MN are typically surveyed 11–14 months after the last one (median 13), measured over 613 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about GRACEPOINTE CROSSING GABLES
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 10 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 10 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in MN, and nationally. Surveyors differ markedly between states, so the MN figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 10 |
| Median facility in MN | 12 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 21, 2023 | 5 |
| June 13, 2024 | 2 |
| September 4, 2025 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 2 | 2025-09-04 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2025-09-04 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2023-07-21 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2025-09-04 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-06-13 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2024-06-13 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2023-07-21 |
| E-0041 | Implement emergency and standby power systems. | 1 | 2023-07-21 |
What the citations cover
- Smoke Deficiencies 5
- Miscellaneous Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Emergency Preparedness Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Miscellaneous Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Emergency Preparedness Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
September 4, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 30, 2025) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (September 30, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (September 30, 2025) |
June 13, 2024 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (June 25, 2024) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (June 25, 2024) |
July 21, 2023 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (September 5, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (September 5, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (September 5, 2023) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (September 27, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 5, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.