Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
PARMLY ON THE LAKE LLC
CHISAGO CITY, MN · 91 certified beds · Last Life Safety survey September 19, 2024
CMS Certification Number 245328 · first certified July 1986
Ownership
Operated by MONARCH HEALTHCARE MANAGEMENT · For profit - Corporation
- Ownership changed December 29, 2017 (change of ownership)from ECUMEN
Position within MN
2 citations — more than 2% of the 338 certified nursing homes in MN. Compared within MN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
When is the next survey likely?
Well past the typical window (August 2025 to November 2025), and past the point by which nine in ten MN facilities have been surveyed. This facility’s last Life Safety survey was September 2024. Facilities in MN are typically surveyed 11–14 months after the last one (median 13), measured over 613 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about PARMLY ON THE LAKE LLC
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 2 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in MN, and nationally. Surveyors differ markedly between states, so the MN figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 2 |
| Median facility in MN | 12 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| February 17, 2022 | 2 |
| July 13, 2023 | 0 |
| September 19, 2024 | 0 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2022-02-17 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2022-02-17 |
What the citations cover
- Smoke Deficiencies 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
February 17, 2022 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (March 18, 2022) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (March 18, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.