Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

FAIR MEADOW NURSING HOME

FERTILE, MN · 42 certified beds · Last Life Safety survey September 1, 2026

CMS Certification Number 245545 · first certified February 1991

Ownership

Independently operated (no chain recorded by CMS) · Government - City

No change of ownership on CMS record since January 1, 2016, when the records begin.

20
Citations on file
CMS's current file
3
Life Safety surveys
CMS's current file
5
Tags cited more than once
Across separate surveys
11
Inspection & testing records
Of the citations on file

Position within MN

20 citations — more than 81% of the 337 certified nursing homes in MN. Compared within MN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in CMS's current file.

The latest survey found 10 citations; the earlier surveys on file averaged 5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens August 2027 — about 9 months from now. This facility’s last Life Safety survey was September 2026. Facilities in MN are typically surveyed 11–14 months after the last one (median 13), measured over 641 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured

Get an email about FAIR MEADOW NURSING HOME

One email when it happens. No account; stop it any time with one click.

Which alerts

2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 20 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.

How that compares

Citations in CMS's current file

Compared with the median facility in MN, and nationally. Surveyors differ markedly between states, so the MN figure is the meaningful one.

This facility20MN median12National median11
Citations in CMS's current file, compared
MeasureCitations
This facility20
Median facility in MN12
Median facility nationally11

Survey history

Citations at each Life Safety survey
82024-0822025-09102026-09
Citations at each Life Safety survey
Survey dateCitations
August 27, 20248
September 10, 20252
September 1, 202610

Most-cited tags

Most-cited tags at this facility
K-03533K-03462K-07122K-09122K-03542K-07611K-09181K-03721
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0353Inspect, test, and maintain automatic sprinkler systems.32026-09-01
K-0346Follow proper procedures when the fire alarm was out of service for more than 4 hours.22026-09-01
K-0712Have simulated fire drills held at unexpected times.22026-09-01
K-0912Have power receptacles that are properly grounded.22026-09-01
K-0354Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours.22026-09-01
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.12025-09-10
K-0918Have generator or other power source capable of supplying service within 10 seconds.12026-09-01
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12024-08-27

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 11
  • Gas, Vacuum, and Electrical Systems Deficiencies 5
  • Miscellaneous Deficiencies 3
  • Egress Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies11
Gas, Vacuum, and Electrical Systems Deficiencies5
Miscellaneous Deficiencies3
Egress Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

September 1, 2026 — 10 citations

Citations issued on September 1, 2026
TagWhat the surveyor checksStatus
K-0226Have horizontal exits used in accordance with safety requirements.Deficient, Provider has plan of correction (September 2, 2026)
K-0324Provide properly protected cooking facilities.Deficient, Provider has plan of correction (September 29, 2026)
K-0346Follow proper procedures when the fire alarm was out of service for more than 4 hours.Deficient, Provider has plan of correction (September 4, 2026)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has plan of correction (September 4, 2026)
K-0354Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours.Deficient, Provider has plan of correction (September 9, 2026)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has plan of correction (September 29, 2026)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has plan of correction (September 24, 2026)
K-0912Have power receptacles that are properly grounded.Deficient, Provider has plan of correction (September 4, 2026)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has plan of correction (September 2, 2026)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has plan of correction (September 25, 2026)

September 10, 2025 — 2 citations

Citations issued on September 10, 2025
TagWhat the surveyor checksStatus
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (November 14, 2025)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (November 14, 2025)

August 27, 2024 — 8 citations

Citations issued on August 27, 2024
TagWhat the surveyor checksStatus
K-0346Follow proper procedures when the fire alarm was out of service for more than 4 hours.Deficient, Provider has date of correction (October 3, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (October 3, 2024)
K-0354Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours.Deficient, Provider has date of correction (October 3, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (October 3, 2024)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (October 3, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (October 3, 2024)
K-0912Have power receptacles that are properly grounded.Deficient, Provider has date of correction (October 3, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (October 3, 2024)

Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.