Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
EDENBROOK OF EDINA
MINNEAPOLIS, MN · 80 certified beds · Last Life Safety survey January 22, 2026
CMS Certification Number 245275 · first certified May 1985
Ownership
Operated by EDEN SENIOR CARE · For profit - Limited Liability company
- Ownership changed June 30, 2017 (change of ownership)from VOA CARE CENTERS, MINNESOTA
Position within MN
27 citations — more than 93% of the 338 certified nursing homes in MN. Compared within MN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 7 citations; the earlier surveys in the window averaged 10. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens December 2026 — about 3 months from now. This facility’s last Life Safety survey was January 2026. Facilities in MN are typically surveyed 11–14 months after the last one (median 13), measured over 613 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about EDENBROOK OF EDINA
One email when it happens. No account; stop it any time with one click.
6 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 27 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 27 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in MN, and nationally. Surveyors differ markedly between states, so the MN figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 27 |
| Median facility in MN | 12 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| December 29, 2023 | 13 |
| October 31, 2024 | 7 |
| January 22, 2026 | 7 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | 3 | 2026-01-22 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2026-01-22 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2024-10-31 |
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2026-01-22 |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 2 | 2026-01-22 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 2 | 2024-10-31 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 2 | 2026-01-22 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2026-01-22 |
What the citations cover
- Smoke Deficiencies 13
- Gas, Vacuum, and Electrical Systems Deficiencies 6
- Miscellaneous Deficiencies 3
- Egress Deficiencies 2
- Other 3
| Category | Citations |
|---|---|
| Smoke Deficiencies | 13 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 6 |
| Miscellaneous Deficiencies | 3 |
| Egress Deficiencies | 2 |
| Services Deficiencies | 2 |
| Emergency Preparedness Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 22, 2026 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (February 9, 2026) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (February 9, 2026) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (February 9, 2026) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (February 9, 2026) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (February 9, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (February 9, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (February 9, 2026) |
October 31, 2024 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (December 5, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (December 5, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (December 5, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (December 5, 2024) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (December 5, 2024) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (December 5, 2024) |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | Deficient, Provider has date of correction (December 5, 2024) |
December 29, 2023 — 13 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (February 19, 2024) |
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | Deficient, Provider has date of correction (February 19, 2024) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (February 19, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (February 19, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (February 19, 2024) |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | Deficient, Provider has date of correction (February 19, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (February 19, 2024) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (February 19, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (February 19, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (February 19, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (February 19, 2024) |
| K-0781 | Have restrictions on the use of portable space heaters. | Deficient, Provider has date of correction (February 19, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (February 19, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.