Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
PROVIDENCE PLACE
MINNEAPOLIS, MN · 190 certified beds · Last Life Safety survey May 14, 2026
CMS Certification Number 245271 · first certified May 1984
Ownership
Operated by LIFESPARK · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MN
12 citations — more than 50% of the 338 certified nursing homes in MN. Compared within MN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens April 2027 — about 7 months from now. This facility’s last Life Safety survey was May 2026. Facilities in MN are typically surveyed 11–14 months after the last one (median 13), measured over 613 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about PROVIDENCE PLACE
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 12 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
How that compares
Compared with the median facility in MN, and nationally. Surveyors differ markedly between states, so the MN figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 12 |
| Median facility in MN | 12 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| April 4, 2024 | 7 |
| February 27, 2025 | 2 |
| May 14, 2026 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 2 | 2026-05-14 |
| K-0311 | Have an enclosure around a vertical opening shaft. | 2 | 2026-05-14 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2024-04-04 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2024-04-04 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2025-02-27 |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | 1 | 2024-04-04 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2024-04-04 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2024-04-04 |
What the citations cover
- Smoke Deficiencies 6
- Services Deficiencies 3
- Egress Deficiencies 3
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Services Deficiencies | 3 |
| Egress Deficiencies | 3 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 14, 2026 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (July 24, 2026) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (July 24, 2026) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (July 24, 2026) |
February 27, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (March 31, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (March 31, 2025) |
April 4, 2024 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (May 13, 2024) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (May 13, 2024) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (May 13, 2024) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (May 13, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (May 13, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (May 13, 2024) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (May 13, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.