Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
LUTHER HAVEN
MONTEVIDEO, MN · 55 certified beds · Last Life Safety survey August 20, 2025
CMS Certification Number 245259 · first certified January 1975
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Church related
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MN
4 citations — more than 5% of the 338 certified nursing homes in MN. Compared within MN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 0 citations; the earlier surveys in the window averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: July 2026 to October 2026. This facility’s last Life Safety survey was August 2025. Facilities in MN are typically surveyed 11–14 months after the last one (median 13), measured over 613 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about LUTHER HAVEN
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
7 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 4 Life Safety citations above. The Physical Environment Index
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in MN, and nationally. Surveyors differ markedly between states, so the MN figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 4 |
| Median facility in MN | 12 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| September 20, 2023 | 1 |
| September 12, 2024 | 3 |
| August 20, 2025 | 0 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0926 | Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk. | 1 | 2024-09-12 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-09-12 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2024-09-12 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2023-09-20 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Smoke Deficiencies 1
- Miscellaneous Deficiencies 1
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Smoke Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
September 12, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (October 11, 2024) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (October 11, 2024) |
| K-0926 | Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk. | Deficient, Provider has date of correction (October 11, 2024) |
September 20, 2023 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (October 20, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.