Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
GABLES OF BOUTWELLS LANDING
OAK PARK HEIGHTS, MN · 108 certified beds · Last Life Safety survey June 10, 2026
CMS Certification Number 245615 · first certified March 2009
Ownership
Operated by PRESBYTERIAN HOMES & SERVICES · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MN
9 citations — more than 31% of the 338 certified nursing homes in MN. Compared within MN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens May 2027 — about 7 months from now. This facility’s last Life Safety survey was June 2026. Facilities in MN are typically surveyed 11–14 months after the last one (median 13), measured over 613 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about GABLES OF BOUTWELLS LANDING
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 9 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in MN, and nationally. Surveyors differ markedly between states, so the MN figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 9 |
| Median facility in MN | 12 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 10, 2024 | 4 |
| April 2, 2025 | 1 |
| June 10, 2026 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0351 | Install an approved automatic sprinkler system. | 2 | 2025-04-02 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2026-06-10 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2026-06-10 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2024-07-10 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-07-10 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2024-07-10 |
| K-0311 | Have an enclosure around a vertical opening shaft. | 1 | 2026-06-10 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2026-06-10 |
What the citations cover
- Smoke Deficiencies 7
- Gas, Vacuum, and Electrical Systems Deficiencies 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 7 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 10, 2026 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has plan of correction (June 15, 2026) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has plan of correction (June 10, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has plan of correction (June 30, 2026) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has plan of correction (August 8, 2026) |
April 2, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (May 30, 2025) |
July 10, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (August 27, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (August 27, 2024) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (August 27, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 27, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.