Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

HAYES RESIDENCE

SAINT PAUL, MN · 40 certified beds · Last Life Safety survey September 10, 2026

CMS Certification Number 24E508 · first certified January 1975

Ownership

Independently operated (no chain recorded by CMS) · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

10
Citations on file
CMS's current file
3
Life Safety surveys
CMS's current file
3
Tags cited more than once
Across separate surveys
9
Inspection & testing records
Of the citations on file

Position within MN

10 citations — more than 36% of the 337 certified nursing homes in MN. Compared within MN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Holding steadyabout the same at the latest survey as at its earlier surveys in CMS's current file.

The latest survey found 3 citations; the earlier surveys on file averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens August 2027 — about 9 months from now. This facility’s last Life Safety survey was September 2026. Facilities in MN are typically surveyed 11–14 months after the last one (median 13), measured over 641 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured

Get an email about HAYES RESIDENCE

One email when it happens. No account; stop it any time with one click.

Which alerts

3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 10 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0909 Regularly inspect all bed frames, mattresses, and bed rails (if any) for safety; and all bed rails and mattresses must attach safely to the bed frame.

How that compares

Citations in CMS's current file

Compared with the median facility in MN, and nationally. Surveyors differ markedly between states, so the MN figure is the meaningful one.

This facility10MN median12National median11
Citations in CMS's current file, compared
MeasureCitations
This facility10
Median facility in MN12
Median facility nationally11

Survey history

Citations at each Life Safety survey
42024-0932025-0632026-09
Citations at each Life Safety survey
Survey dateCitations
September 24, 20244
June 26, 20253
September 10, 20263

Most-cited tags

Most-cited tags at this facility
K-09182K-07122K-03452K-02911K-05111K-03531K-02251
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0918Have generator or other power source capable of supplying service within 10 seconds.22026-09-10
K-0712Have simulated fire drills held at unexpected times.22025-06-26
K-0345Have approved installation, maintenance and testing program for fire alarm systems.22026-09-10
K-0291Install emergency lighting that can last at least 1 1/2 hours.12024-09-24
K-0511Have properly installed electrical wiring and gas equipment.12025-06-26
K-0353Inspect, test, and maintain automatic sprinkler systems.12026-09-10
K-0225Have stairways and smokeproof enclosures used as exits that meet safety requirements.12025-06-26

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 3
  • Gas, Vacuum, and Electrical Systems Deficiencies 2
  • Miscellaneous Deficiencies 2
  • Egress Deficiencies 2
  • Other 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies3
Gas, Vacuum, and Electrical Systems Deficiencies2
Miscellaneous Deficiencies2
Egress Deficiencies2
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

September 10, 2026 — 3 citations

Citations issued on September 10, 2026
TagWhat the surveyor checksStatus
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has no plan of correction
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has no plan of correction
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has no plan of correction

June 26, 2025 — 3 citations

Citations issued on June 26, 2025
TagWhat the surveyor checksStatus
K-0225Have stairways and smokeproof enclosures used as exits that meet safety requirements.Deficient, Provider has date of correction (August 12, 2025)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (August 12, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (August 12, 2025)

September 24, 2024 — 4 citations

Citations issued on September 24, 2024
TagWhat the surveyor checksStatus
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (November 15, 2024)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (November 15, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (November 15, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (November 15, 2024)

Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.