Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
FOUNTAINBLEAU LODGE
CAPE GIRARDEAU, MO · 33 certified beds · Last Life Safety survey September 4, 2025
CMS Certification Number 265383 · first certified August 1989
Ownership
Operated by SHAFIQ MALIK · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MO
10 citations — more than 23% of the 487 certified nursing homes in MO. Compared within MO rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens November 2026 — about 1 month from now. This facility’s last Life Safety survey was September 2025. Facilities in MO are typically surveyed 14–21 months after the last one (median 17), measured over 567 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about FOUNTAINBLEAU LODGE
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 10 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in MO, and nationally. Surveyors differ markedly between states, so the MO figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 10 |
| Median facility in MO | 18 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 10, 2023 | 4 |
| August 8, 2024 | 2 |
| September 4, 2025 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 3 | 2025-09-04 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 2 | 2025-09-04 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2025-09-04 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2024-08-08 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 1 | 2023-03-10 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2025-09-04 |
What the citations cover
- Smoke Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Egress Deficiencies 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Egress Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
September 4, 2025 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (October 18, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (October 18, 2025) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (October 18, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (October 18, 2025) |
August 8, 2024 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (September 22, 2024) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (September 22, 2024) |
March 10, 2023 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (March 10, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (March 13, 2023) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (March 28, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (April 3, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.