Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
ELSBERRY MISSOURI HEALTH CARE CENTER
ELSBERRY, MO · 56 certified beds · Last Life Safety survey July 31, 2025
CMS Certification Number 265825 · first certified January 2009
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MO
8 citations — more than 16% of the 487 certified nursing homes in MO. Compared within MO rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens October 2026. This facility’s last Life Safety survey was July 2025. Facilities in MO are typically surveyed 14–21 months after the last one (median 17), measured over 567 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about ELSBERRY MISSOURI HEALTH CARE CENTER
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 8 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in MO, and nationally. Surveyors differ markedly between states, so the MO figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 8 |
| Median facility in MO | 18 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| October 28, 2020 | 3 |
| October 19, 2023 | 1 |
| July 31, 2025 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 2 | 2025-07-31 |
| K-0932 | Meet other general requirements. | 1 | 2020-10-28 |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | 1 | 2025-07-31 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2025-07-31 |
| K-0100 | Meet other general requirements. | 1 | 2025-07-31 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2020-10-28 |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | 1 | 2020-10-28 |
What the citations cover
- Smoke Deficiencies 4
- Construction Deficiencies 1
- Miscellaneous Deficiencies 1
- Gas, Vacuum, and Electrical Systems Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Construction Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
July 31, 2025 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0100 | Meet other general requirements. | Deficient, Provider has date of correction (September 14, 2025) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (September 14, 2025) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (September 14, 2025) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (September 14, 2025) |
October 19, 2023 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (December 1, 2023) |
October 28, 2020 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 11, 2020) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (December 11, 2020) |
| K-0932 | Meet other general requirements. | Deficient, Provider has date of correction (December 11, 2020) |