Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

FIESER NURSING CENTER

FENTON, MO · 47 certified beds · Last Life Safety survey September 30, 2025

CMS Certification Number 26A490 · first certified August 2006

Ownership

Independently operated (no chain recorded by CMS) · For profit - Individual

No change of ownership on CMS record since January 1, 2016, when the records begin.

29
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
6
Tags cited more than once
Across separate surveys
12
Inspection & testing records
Of the citations on file

Position within MO

29 citations — more than 76% of the 487 certified nursing homes in MO. Compared within MO rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 8 citations; the earlier surveys in the window averaged 10.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens December 2026 — about 2 months from now. This facility’s last Life Safety survey was September 2025. Facilities in MO are typically surveyed 14–21 months after the last one (median 17), measured over 567 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about FIESER NURSING CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

6 of the 29 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 29 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0909 Regularly inspect all bed frames, mattresses, and bed rails (if any) for safety; and all bed rails and mattresses must attach safely to the bed frame.

How that compares

Citations on file over three years

Compared with the median facility in MO, and nationally. Surveyors differ markedly between states, so the MO figure is the meaningful one.

This facility29MO median18National median11
Citations on file over three years, compared
MeasureCitations
This facility29
Median facility in MO18
Median facility nationally11

Survey history

Citations at each Life Safety survey
102021-12112024-0282025-09
Citations at each Life Safety survey
Survey dateCitations
December 20, 202110
February 20, 202411
September 30, 20258

Most-cited tags

Most-cited tags at this facility
K-03452K-03722E-00042K-09202E-00062K-09182K-05001K-03531
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0345Have approved installation, maintenance and testing program for fire alarm systems.22025-09-30
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.22025-09-30
E-0004Develop and maintain an Emergency Preparedness Program (EP).22024-02-20
K-0920Ensure proper usage of power strips and extension cords.22024-02-20
E-0006Conduct risk assessment and an All-Hazards approach.22025-09-30
K-0918Have generator or other power source capable of supplying service within 10 seconds.22025-09-30
K-0500Meet other general requirements that are deficient.12025-09-30
K-0353Inspect, test, and maintain automatic sprinkler systems.12024-02-20

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 9
  • Emergency Preparedness Deficiencies 6
  • Gas, Vacuum, and Electrical Systems Deficiencies 6
  • Miscellaneous Deficiencies 3
  • Other 5
Citations by CMS category
CategoryCitations
Smoke Deficiencies9
Emergency Preparedness Deficiencies6
Gas, Vacuum, and Electrical Systems Deficiencies6
Miscellaneous Deficiencies3
Services Deficiencies3
Egress Deficiencies2

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

September 30, 2025 — 8 citations

Citations issued on September 30, 2025
TagWhat the surveyor checksStatus
E-0006Conduct risk assessment and an All-Hazards approach.Deficient, Provider has date of correction (November 13, 2025)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (November 13, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (November 13, 2025)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (November 13, 2025)
K-0500Meet other general requirements that are deficient.Deficient, Provider has date of correction (November 13, 2025)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (November 13, 2025)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (November 13, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (November 13, 2025)

February 20, 2024 — 11 citations

Citations issued on February 20, 2024
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (April 6, 2024)
E-0006Conduct risk assessment and an All-Hazards approach.Deficient, Provider has date of correction (April 6, 2024)
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (April 6, 2024)
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Deficient, Provider has date of correction (April 15, 2024)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (April 6, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (April 6, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (April 6, 2024)
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.Deficient, Provider has date of correction (April 6, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (April 15, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (April 6, 2024)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (April 6, 2024)

December 20, 2021 — 10 citations

Citations issued on December 20, 2021
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (February 3, 2022)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (February 3, 2022)
K-0346Follow proper procedures when the fire alarm was out of service for more than 4 hours.Deficient, Provider has date of correction (February 3, 2022)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (February 3, 2022)
K-0354Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours.Deficient, Provider has date of correction (February 3, 2022)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (February 3, 2022)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (February 3, 2022)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (February 3, 2022)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (February 3, 2022)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (February 3, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.