Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
3
Tags cited more than once
Across separate surveys
9
Inspection & testing records
Of the citations on file

Position within MO

24 citations — more than 64% of the 487 certified nursing homes in MO. Compared within MO rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 2 citations; the earlier surveys in the window averaged 11. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Well past the typical window (July 2025 to February 2026), and past the point by which nine in ten MO facilities have been surveyed. This facility’s last Life Safety survey was May 2024. Facilities in MO are typically surveyed 14–21 months after the last one (median 17), measured over 567 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about OAK KNOLL SKILLED NURSING & REHABILITATION CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

6 of the 24 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 24 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0909 Regularly inspect all bed frames, mattresses, and bed rails (if any) for safety; and all bed rails and mattresses must attach safely to the bed frame.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.

How that compares

Citations on file over three years

Compared with the median facility in MO, and nationally. Surveyors differ markedly between states, so the MO figure is the meaningful one.

This facility24MO median18National median11
Citations on file over three years, compared
MeasureCitations
This facility24
Median facility in MO18
Median facility nationally11

Survey history

Citations at each Life Safety survey
112019-09112022-1122024-05
Citations at each Life Safety survey
Survey dateCitations
September 24, 201911
November 11, 202211
May 24, 20242

Most-cited tags

Most-cited tags at this facility
K-03212K-03532E-00042K-02111K-07411K-05111E-00061K-03721
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.22022-11-11
K-0353Inspect, test, and maintain automatic sprinkler systems.22024-05-24
E-0004Develop and maintain an Emergency Preparedness Program (EP).22022-11-11
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12022-11-11
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.12019-09-24
K-0511Have properly installed electrical wiring and gas equipment.12022-11-11
E-0006Conduct risk assessment and an All-Hazards approach.12022-11-11
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12019-09-24

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 9
  • Emergency Preparedness Deficiencies 6
  • Gas, Vacuum, and Electrical Systems Deficiencies 4
  • Miscellaneous Deficiencies 3
  • Other 2
Citations by CMS category
CategoryCitations
Smoke Deficiencies9
Emergency Preparedness Deficiencies6
Gas, Vacuum, and Electrical Systems Deficiencies4
Miscellaneous Deficiencies3
Egress Deficiencies1
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

May 24, 2024 — 2 citations

Citations issued on May 24, 2024
TagWhat the surveyor checksStatus
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (July 8, 2024)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (July 8, 2024)

November 11, 2022 — 11 citations

Citations issued on November 11, 2022
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (January 6, 2023)
E-0006Conduct risk assessment and an All-Hazards approach.Deficient, Provider has date of correction (January 11, 2023)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (January 6, 2023)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (January 6, 2023)
K-0347Properly provide smoke detection systems in areas open to corridors.Deficient, Provider has date of correction (January 6, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (January 13, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (January 6, 2023)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (January 6, 2023)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (January 6, 2023)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (January 6, 2023)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (January 16, 2023)

September 24, 2019 — 11 citations

Citations issued on September 24, 2019
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (November 8, 2019)
E-0007Address patient/client population and determine types of services needed.Deficient, Provider has date of correction (November 8, 2019)
E-0015Address subsistence needs for staff and patients.Deficient, Provider has date of correction (November 8, 2019)
E-0030List the names and contact information of those in the facility.Deficient, Provider has date of correction (November 8, 2019)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (November 8, 2019)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (November 8, 2019)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (November 8, 2019)
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.Deficient, Provider has date of correction (November 8, 2019)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (November 8, 2019)
K-0919Meet requirements for the use of electrical equipment.Deficient, Provider has date of correction (November 8, 2019)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (November 8, 2019)