Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

FULTON MANOR CARE CENTER

FULTON, MO · 52 certified beds · Last Life Safety survey January 30, 2025

CMS Certification Number 265760 · first certified August 2003

Ownership

Operated by JUCKETTE FAMILY HOMES · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

22
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
5
Tags cited more than once
Across separate surveys
9
Inspection & testing records
Of the citations on file

Position within MO

22 citations — more than 58% of the 487 certified nursing homes in MO. Compared within MO rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Holding steadyabout the same at the latest survey as at its earlier surveys in the window.

The latest survey found 7 citations; the earlier surveys in the window averaged 7.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: April 2026 to October 2026. This facility’s last Life Safety survey was January 2025. Facilities in MO are typically surveyed 14–21 months after the last one (median 17), measured over 567 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about FULTON MANOR CARE CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

3 of the 22 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 22 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0909 Regularly inspect all bed frames, mattresses, and bed rails (if any) for safety; and all bed rails and mattresses must attach safely to the bed frame.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.

How that compares

Citations on file over three years

Compared with the median facility in MO, and nationally. Surveyors differ markedly between states, so the MO figure is the meaningful one.

This facility22MO median18National median11
Citations on file over three years, compared
MeasureCitations
This facility22
Median facility in MO18
Median facility nationally11

Survey history

Citations at each Life Safety survey
82022-1272024-0272025-01
Citations at each Life Safety survey
Survey dateCitations
December 16, 20228
February 9, 20247
January 30, 20257

Most-cited tags

Most-cited tags at this facility
K-07123E-00372K-03452K-09262K-01612E-00391K-07611K-02221
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0712Have simulated fire drills held at unexpected times.32025-01-30
E-0037Establish staff and initial training requirements.22025-01-30
K-0345Have approved installation, maintenance and testing program for fire alarm systems.22024-02-09
K-0926Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk.22025-01-30
K-0161Use approved construction type or materials.22025-01-30
E-0039Conduct testing and exercise requirements.12025-01-30
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.12022-12-16
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.12022-12-16

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 6
  • Miscellaneous Deficiencies 4
  • Gas, Vacuum, and Electrical Systems Deficiencies 4
  • Egress Deficiencies 3
  • Other 5
Citations by CMS category
CategoryCitations
Smoke Deficiencies6
Miscellaneous Deficiencies4
Gas, Vacuum, and Electrical Systems Deficiencies4
Egress Deficiencies3
Emergency Preparedness Deficiencies3
Construction Deficiencies2

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

January 30, 2025 — 7 citations

Citations issued on January 30, 2025
TagWhat the surveyor checksStatus
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (March 1, 2025)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (February 28, 2025)
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (March 7, 2025)
K-0271Have exits that are accessible at all times.Deficient, Provider has date of correction (February 28, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (February 28, 2025)
K-0911Meet requirements for the installation and maintenance of electrical systems.Deficient, Provider has date of correction (February 7, 2025)
K-0926Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk.Deficient, Provider has date of correction (March 3, 2025)

February 9, 2024 — 7 citations

Citations issued on February 9, 2024
TagWhat the surveyor checksStatus
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (March 29, 2024)
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (March 29, 2024)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (March 29, 2024)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (March 29, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (March 29, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (March 29, 2024)
K-0926Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk.Deficient, Provider has date of correction (March 29, 2024)

December 16, 2022 — 8 citations

Citations issued on December 16, 2022
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (January 6, 2023)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (January 30, 2023)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (December 20, 2022)
K-0353Inspect, test, and maintain automatic sprinkler systems.Waiver has been granted (April 30, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (January 10, 2023)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (December 28, 2022)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (January 16, 2023)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (January 10, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.