Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
NODAWAY HEALTHCARE
MARYVILLE, MO · 60 certified beds · Last Life Safety survey February 13, 2026
CMS Certification Number 265836 · first certified July 2010
Ownership
Operated by BLUE SKY BASIN, LLC · For profit - Limited Liability company
- Ownership changed December 1, 2022 (change of ownership)from TIFFANY CARE CENTERS INC
Position within MO
21 citations — more than 55% of the 487 certified nursing homes in MO. Compared within MO rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 6.7. With 4 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens April 2027 — about 7 months from now. This facility’s last Life Safety survey was February 2026. Facilities in MO are typically surveyed 14–21 months after the last one (median 17), measured over 567 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about NODAWAY HEALTHCARE
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
3 of the 21 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 21 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in MO, and nationally. Surveyors differ markedly between states, so the MO figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 21 |
| Median facility in MO | 18 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 21, 2022 | 9 |
| October 10, 2024 | 3 |
| August 7, 2025 | 8 |
| February 13, 2026 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2025-08-07 |
| E-0039 | Conduct testing and exercise requirements. | 2 | 2024-10-10 |
| K-0161 | Use approved construction type or materials. | 2 | 2025-08-07 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2022-03-21 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2022-03-21 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2025-08-07 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2025-08-07 |
| E-0026 | Establish roles under a Waiver declared by secretary. | 1 | 2022-03-21 |
What the citations cover
- Smoke Deficiencies 7
- Egress Deficiencies 3
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Emergency Preparedness Deficiencies 3
- Other 5
| Category | Citations |
|---|---|
| Smoke Deficiencies | 7 |
| Egress Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Emergency Preparedness Deficiencies | 3 |
| Construction Deficiencies | 2 |
| Miscellaneous Deficiencies | 2 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
February 13, 2026 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (March 14, 2026) |
August 7, 2025 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (September 23, 2025) |
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (September 23, 2025) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (September 23, 2025) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (September 23, 2025) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (September 23, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 23, 2025) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (September 23, 2025) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (September 23, 2025) |
October 10, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (October 16, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (December 10, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (October 16, 2024) |
March 21, 2022 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0026 | Establish roles under a Waiver declared by secretary. | Deficient, Provider has date of correction (June 20, 2022) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (June 20, 2022) |
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (June 20, 2022) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (June 20, 2022) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 20, 2022) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (June 20, 2022) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (June 20, 2022) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (June 20, 2022) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (June 20, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.