Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

SHIRKEY NURSING AND REHABILITATION CENTER

RICHMOND, MO · 197 certified beds · Last Life Safety survey May 8, 2025

CMS Certification Number 265708 · first certified October 2000

Ownership

Independently operated (no chain recorded by CMS) · Government - County

No change of ownership on CMS record since January 1, 2016, when the records begin.

35
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
7
Tags cited more than once
Across separate surveys
10
Inspection & testing records
Of the citations on file

Position within MO

35 citations — more than 87% of the 487 certified nursing homes in MO. Compared within MO rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 5 citations; the earlier surveys in the window averaged 15. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: July 2026 to January 2027. This facility’s last Life Safety survey was May 2025. Facilities in MO are typically surveyed 14–21 months after the last one (median 17), measured over 567 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about SHIRKEY NURSING AND REHABILITATION CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

2 of the 35 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 35 Life Safety citations above. The Physical Environment Index

  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.

How that compares

Citations on file over three years

Compared with the median facility in MO, and nationally. Surveyors differ markedly between states, so the MO figure is the meaningful one.

This facility35MO median18National median11
Citations on file over three years, compared
MeasureCitations
This facility35
Median facility in MO18
Median facility nationally11

Survey history

Citations at each Life Safety survey
182022-04122024-0452025-05
Citations at each Life Safety survey
Survey dateCitations
April 20, 202218
April 5, 202412
May 8, 20255

Most-cited tags

Most-cited tags at this facility
K-03213K-03412K-09202K-02222K-02112K-03532K-03512K-02711
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.32025-05-08
K-0341Install a fire alarm system that can be heard throughout the facility.22024-04-05
K-0920Ensure proper usage of power strips and extension cords.22025-05-08
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.22024-04-05
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.22024-04-05
K-0353Inspect, test, and maintain automatic sprinkler systems.22024-04-05
K-0351Install an approved automatic sprinkler system.22024-04-05
K-0271Have exits that are accessible at all times.12025-05-08

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 15
  • Egress Deficiencies 6
  • Gas, Vacuum, and Electrical Systems Deficiencies 5
  • Miscellaneous Deficiencies 4
  • Other 5
Citations by CMS category
CategoryCitations
Smoke Deficiencies15
Egress Deficiencies6
Gas, Vacuum, and Electrical Systems Deficiencies5
Miscellaneous Deficiencies4
Emergency Preparedness Deficiencies2
Construction Deficiencies2
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

May 8, 2025 — 5 citations

Citations issued on May 8, 2025
TagWhat the surveyor checksStatus
K-0271Have exits that are accessible at all times.Deficient, Provider has date of correction (June 22, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (June 22, 2025)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (June 22, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (June 22, 2025)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (June 22, 2025)

April 5, 2024 — 12 citations

Citations issued on April 5, 2024
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (May 31, 2024)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (May 31, 2024)
K-0281Install proper backup exit lighting.Deficient, Provider has date of correction (May 31, 2024)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (May 31, 2024)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (May 31, 2024)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (May 31, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (May 31, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (May 31, 2024)
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.Deficient, Provider has date of correction (May 31, 2024)
K-0753Have restrictions on the use of highly flammable decorations.Deficient, Provider has date of correction (May 31, 2024)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (May 31, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (May 31, 2024)

April 20, 2022 — 18 citations

Citations issued on April 20, 2022
TagWhat the surveyor checksStatus
E-0022Establish policies and procedures for sheltering.Deficient, Provider has date of correction (June 2, 2022)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (June 2, 2022)
K-0100Meet other general requirements.Deficient, Provider has date of correction (June 2, 2022)
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (June 2, 2022)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (June 2, 2022)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (June 2, 2022)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (June 2, 2022)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (June 2, 2022)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (June 2, 2022)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (June 2, 2022)
K-0354Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours.Deficient, Provider has date of correction (June 2, 2022)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (June 2, 2022)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (June 2, 2022)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (June 2, 2022)
K-0531Have elevators that firefighters can control in the event of a fire.Deficient, Provider has date of correction (June 2, 2022)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (June 2, 2022)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (June 2, 2022)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (June 2, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.