Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
ASPEN POINT HEALTH AND REHABILITATION
SAINT CHARLES, MO · 180 certified beds · Last Life Safety survey August 14, 2025
CMS Certification Number 265118 · first certified January 1975
Ownership
Operated by VERTICAL HEALTH SERVICES · For profit - Limited Liability company
- Ownership changed June 1, 2023 (change of ownership)from SRZ OP FRONTIER LLC
Position within MO
23 citations — more than 61% of the 487 certified nursing homes in MO. Compared within MO rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 9.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens October 2026 — about 1 month from now. This facility’s last Life Safety survey was August 2025. Facilities in MO are typically surveyed 14–21 months after the last one (median 17), measured over 567 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about ASPEN POINT HEALTH AND REHABILITATION
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
3 of the 23 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
14 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 23 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0908 Keep all essential equipment working safely.
How that compares
Compared with the median facility in MO, and nationally. Surveyors differ markedly between states, so the MO figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 23 |
| Median facility in MO | 18 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 29, 2024 | 10 |
| February 27, 2025 | 9 |
| August 14, 2025 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2025-02-27 |
| K-0311 | Have an enclosure around a vertical opening shaft. | 2 | 2025-02-27 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2025-08-14 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 2 | 2025-08-14 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2025-02-27 |
| E-0039 | Conduct testing and exercise requirements. | 1 | 2024-08-29 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2024-08-29 |
| K-0919 | Meet requirements for the use of electrical equipment. | 1 | 2025-08-14 |
What the citations cover
- Smoke Deficiencies 13
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Emergency Preparedness Deficiencies 3
- Miscellaneous Deficiencies 3
| Category | Citations |
|---|---|
| Smoke Deficiencies | 13 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Emergency Preparedness Deficiencies | 3 |
| Miscellaneous Deficiencies | 3 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 14, 2025 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (September 10, 2025) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (September 10, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (September 10, 2025) |
| K-0932 | Meet other general requirements. | Deficient, Provider has date of correction (September 10, 2025) |
February 27, 2025 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (March 25, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Waiver has been granted |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Waiver has been granted |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Waiver has been granted |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (March 25, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (March 25, 2025) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (March 25, 2025) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Waiver has been granted |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (March 25, 2025) |
August 29, 2024 — 10 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0020 | Establish policies and procedures including evacuation. | Deficient, Provider has date of correction (October 12, 2024) |
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (October 12, 2024) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (October 12, 2024) |
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (October 12, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (October 12, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (October 12, 2024) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (October 12, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (October 12, 2024) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (October 12, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (October 12, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.